22.01.2016 Views

Phase 1 Bike Plan_r

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

G2<br />

F1<br />

F2<br />

F3<br />

INFRASTRUCTURE<br />

Low Cost/Rapid Implementa on<br />

<strong>Bike</strong> Boulevard<br />

<strong>Bike</strong> Boulevard as<br />

Transi onal<br />

Treatment<br />

Buffered <strong>Bike</strong><br />

Lane<br />

Buffered <strong>Bike</strong> Lane<br />

as Transi onal<br />

Treatment<br />

Mul -use Sidepath<br />

(one side) as<br />

Transi onal<br />

Treatment<br />

G1<br />

G2<br />

G3<br />

Strategic Capital Investment<br />

1-way Cycle Track<br />

(both sides)<br />

Mul -use Sidepath<br />

(one side); pink<br />

indicates side of<br />

street on which<br />

facility should be<br />

installed<br />

Off Road Mul -use<br />

Trail<br />

Specialized Treatments<br />

Mid-block crossing<br />

loca on<br />

Supplemental Specialized Treatments<br />

are listed in Table 8, page 47.<br />

NORTH<br />

H1<br />

H2<br />

H3<br />

30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!