Notes to Consolidated Financial Statements<br />
13 PROPERTY, PLANT AND EQUIPMENT, NET (Continued)<br />
Note:<br />
(a)<br />
(b)<br />
(c)<br />
(d)<br />
(e)<br />
Majority part of the Group’s property, plant and equipment are located in Mongolia.<br />
Mining properties as at 31 December 2015 include stripping activity assets carrying book value of USD225,233,000<br />
(2014: USD223,451,000) and application fee for the mining rights of USD770,000 (2014: USD627,000) in relation to<br />
the Group’s mine deposits.<br />
The addition of mining properties for the year ended 31 December 2015 include the increase in reclamation<br />
provision of USD454,000 (2014: increase in reclamation provision of USD3,467,000) (see Note 28).<br />
As at 31 December 2015, certain of the Group’s borrowings were secured by the Group’s coal handling and<br />
preparation plant-modules I and II, power plant and water supply infrastructure assets-phase I with net book values<br />
of USD91,100,000, USD23,519,000 and USD2,532,000, respectively (31 December 2014: USD105,290,000,<br />
USD27,629,000 and USD3,008,000, respectively) (see Note 23).<br />
As at 31 December 2015, the Group is in the process of applying for the ownership certificates for certain of its<br />
buildings. The aggregate carrying value of such properties of the Group as at 31 December 2015 is approximately<br />
USD6,467,000. The Directors are of the opinion that the Group is entitled to lawfully occupy or use of these<br />
properties.<br />
14 CONSTRUCTION IN PROGRESS<br />
2015 2014<br />
USD’000 USD’000<br />
At 1 January 58,421 148,371<br />
Additions 184 6,314<br />
Transfer to property, plant and equipment (Note 13) — (86,855)<br />
Transfer to intangible assets (Note 16) — (4,909)<br />
Disposal (443) —<br />
Exchange adjustments (2,998) (4,500)<br />
At 31 December 55,164 58,421<br />
The construction in progress is mainly related to water supply facility and other mining related machinery and<br />
equipment.<br />
Annual Report 2015<br />
157