19.07.2016 Views

FOREWORD

SAG_Post_Games_Report

SAG_Post_Games_Report

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The first phase of city branding started around<br />

December 25th 2015 with the support of various<br />

PSUs like SBI, LIC and OIL wherein co-branding<br />

at various key locations in the North East was<br />

done with them. The city and venue branding<br />

efforts were further intensified around the Chef de<br />

Mission seminar which was followed by increased<br />

branding all around the cities of Guwhati &<br />

Shillong. The last phase of city and venue<br />

branding was initiated on January 27th 2016 in<br />

which every nook and corner of the cities as well<br />

as the venues were painted in SAG colours.<br />

Fact: More than 90 kms. of road length covered.<br />

176<br />

12 th SOUTH ASIAN GAMES | POST GAMES REPORT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!