Hydrocarbon Vision 2030 (ஹைட்ரோகார்பன் தொலைநோக்கு ஆவணம் 2030)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
6.6 Action plan<br />
The action plan for augmenting the prospects of the oil and gas midstream sector in the Northeast<br />
region is given below.<br />
Table 69: Action plan for midstream sector in Northeast India<br />
Action items<br />
Concerned<br />
authorities<br />
Infrastructure - Crude oil pipeline capacity<br />
Paradip-Siliguri-<br />
Numaligarh Imported<br />
crude oil pipeline<br />
Barauni-Bongaigaon<br />
pipeline<br />
NRL<br />
OIL<br />
Infrastructure- Natural gas pipeline capacity<br />
Short term<br />
(less than 2 years)<br />
OIL to maintain the same<br />
capacity of pipeline as per<br />
requirement of NE refineries.<br />
OIL to consider capacity<br />
enhancement of pipeline for<br />
expansion of refineries in the<br />
region<br />
Timeline<br />
Medium term<br />
(2-5 years)<br />
Achieve<br />
financial closure<br />
and start laying<br />
pipelines<br />
Long term<br />
(More than<br />
5 years)<br />
Gas grid phase I:<br />
Duliajan/Numaligarh<br />
pipeline to Guwahati<br />
(enhancing capacity)<br />
GAIL/NRL/OIL/<br />
PNGRB/MoPN<br />
G/AGCL/TNGC<br />
L/State Govt<br />
(GAIL to<br />
coordinate)<br />
Route and demand survey<br />
Feasibility study<br />
Project needs to be<br />
undertaken on<br />
VGF/budgetary support<br />
model. Amount needs to<br />
be determined<br />
Implementation<br />
Gas grid phase II:<br />
Agartala-Silchar-<br />
Shillong- Guwahati-<br />
Bongaigaon (spur lines-<br />
Silchar-Aizawl and<br />
Silchar-Imphal)<br />
GAIL/<br />
PNGRB/MoPN<br />
G/AGCL/TNGC<br />
L/<br />
State Govt<br />
(GAIL to<br />
coordinate)<br />
Feasibility study needs to<br />
be developed for this route<br />
by GAIL<br />
Project needs to be taken<br />
on VGF/Budgetary support<br />
model. Amount needs to<br />
be determined.<br />
Implementation<br />
Gas grid phase III:<br />
Connect Barauni with<br />
Guwahati<br />
GAIL/<br />
PNGRB/MoPN<br />
G/AGCL/TNGC<br />
L/State Govt<br />
(GAIL to<br />
coordinate)<br />
Conduct feasibility study<br />
Assess funding<br />
requirement and other<br />
support from other<br />
ministries<br />
Implementation<br />
Gas pipeline from<br />
Myanmar to Agartala<br />
(Sitwe-Aizawl-Silchar)<br />
MoPNG/MEA/G<br />
AIL<br />
(GAIL to<br />
coordinate)<br />
Feasibility Study<br />
Phase I, II & III need to be given to PSUs (GAIL, AGCL, TNGCL etc) on nomination basis<br />
Infrastructure - Product pipeline capacity<br />
Implementati<br />
on<br />
Guwahati-Lumding -<br />
Silchar-Imphal (further<br />
extension to<br />
Aizawl/Agartala)<br />
IOCL<br />
Conduct feasibility study<br />
Assess requirement of<br />
VGF/budgetary support<br />
Assess support required<br />
from other ministries<br />
Review for<br />
implementati<br />
on<br />
108