- Page 1 and 2: Double the production of Oil and Na
- Page 3 and 4: 6.3.1 Existing pipelines 97 6.3.2 U
- Page 5 and 6: 12.2.5 Other industries around oil
- Page 7 and 8: Message from Hon’ble Minister Shr
- Page 9 and 10: Preface & Acknowledgments Shri Ajay
- Page 11: Prologue Shri U P Singh, IAS, (Addi
- Page 14 and 15: 1. Executive summary The North East
- Page 16 and 17: Policymakers and economists have re
- Page 18 and 19: Challenges in northeastern region K
- Page 20 and 21: Action plan Rationale Responsible a
- Page 22 and 23: Action plan Rationale Responsible a
- Page 24 and 25: Action plan Rationale Responsible a
- Page 26 and 27: Action plan Rationale Responsible a
- Page 28 and 29: To address the premature deaths cau
- Page 30 and 31: Implementation approach Implementat
- Page 32 and 33: 3. Brief description of Northeast I
- Page 34 and 35: Arunachal Pradesh Arunachal Pradesh
- Page 36 and 37: Meghalaya Meghalaya, literally mean
- Page 38 and 39: Nagaland Nagaland is located on the
- Page 40 and 41: Sikkim Sikkim, enveloped by the Him
- Page 42 and 43: as in the national economy. Assam
- Page 44 and 45: 3.3.5 Tripura In rupee terms, gross
- Page 46 and 47: 3.3.9 Comparison of per capita inco
- Page 50 and 51: 4. Oil & gas sector outlook in Nort
- Page 52 and 53: Table 22: Prognosticated hydrocarbo
- Page 54 and 55: 4.3.2.2 Pre NELP and NELP regime Th
- Page 56 and 57: The following table provides inform
- Page 58 and 59: 4.4.1 Upstream The upstream oil sec
- Page 60 and 61: Entity name BCPL BVFCL Power plants
- Page 62 and 63: Hon'ble MoS (I/C), Petroleum & Natu
- Page 64 and 65: Company/ regime Others/PSC (Kharsan
- Page 66 and 67: Figure 15: Production forecast for
- Page 68 and 69: Figure 18: Production forecast for
- Page 70 and 71: 5.1.3 Key issues in upstream sector
- Page 72 and 73: The service company either charges
- Page 74 and 75: Figure 24: Detailed stages for sign
- Page 76 and 77: Case Study- Nigeria Oil was first d
- Page 78 and 79: (ii) Use of new technology Incentiv
- Page 80 and 81: Increased drilling efforts are requ
- Page 82 and 83: 5.1.4.3 Resolution of disputes 5.1.
- Page 84 and 85: 5.1.4.3.2 Disturbed area belt (DAB)
- Page 86 and 87: 5.1.4.3.5 Action area Based on the
- Page 88 and 89: 5.1.4.4.3 Operating cost Once the d
- Page 90 and 91: 5.1.4.4.5 Action areas The new disc
- Page 92 and 93: 5.1.4.4.8 Analysis of life cycle co
- Page 94 and 95: at a reasonable price. This will en
- Page 96 and 97: 5.1.4.6 Policy environment 5.1.4.6.
- Page 98 and 99:
Single window clearance/Approval sh
- Page 100 and 101:
Such relinquished areas in NER shou
- Page 102 and 103:
Initially, ONGC held close to 10,61
- Page 104 and 105:
Action items Authorities concerned
- Page 107 and 108:
6. Midstream
- Page 109 and 110:
Table 60 Crude oil pipelines in the
- Page 111 and 112:
6.2.2 Planned network Given the ina
- Page 113 and 114:
IOCL is expected to submit a feasib
- Page 115 and 116:
Table 66: Locations where gas is fl
- Page 117 and 118:
entities. State entities can play i
- Page 119 and 120:
The pipeline is estimated to span a
- Page 121 and 122:
Offering of relinquished areas to N
- Page 123 and 124:
Action items Concerned authorities
- Page 125 and 126:
6.7 Proposed energy corridor Propos
- Page 127 and 128:
VGF requirement/budgetary support f
- Page 129 and 130:
Ranchi-Talcher-Paradip pipeline net
- Page 131 and 132:
7. Downstream infrastructure
- Page 133 and 134:
India (CCI) for utilizing raw petro
- Page 135 and 136:
7.2.1 Existing demand for petroleum
- Page 137 and 138:
Existing LPG connections in Northea
- Page 139 and 140:
Figure 40: Per capita consumption o
- Page 141 and 142:
Scenario 3: Based on average of 5-y
- Page 143 and 144:
Table 85: Demand in TMTPA for POL p
- Page 145 and 146:
7.2.4 Mapping demand-supply of POL
- Page 147 and 148:
7.2.5 Special products in NER refin
- Page 149 and 150:
Table 95: MS production from NRL re
- Page 151 and 152:
Table 97: Existing bottling plants
- Page 153 and 154:
POL infrastructure Currently, there
- Page 155 and 156:
Figure 48: LPG storage capacity in
- Page 157 and 158:
7.3 Demand-supply assessment of nat
- Page 159 and 160:
Availability of gas in Silchar If O
- Page 161 and 162:
7.3.2.8 Summary of demand of natura
- Page 163 and 164:
Sr. no. Key issues Description of i
- Page 165 and 166:
7.5 Key action areas The action are
- Page 167 and 168:
Apart from the above initiatives of
- Page 169 and 170:
Utilisation of natural gas locally
- Page 171 and 172:
Table 116: Port handling facilities
- Page 173 and 174:
Wax project by NRL NRL has commissi
- Page 175 and 176:
7.5.2.8 Cascading of gas The flarin
- Page 177 and 178:
Figure 52: Flared gas transportatio
- Page 179 and 180:
The above cities need to be connect
- Page 181 and 182:
Hon’ble Minister of State (I/C) M
- Page 183 and 184:
Action items Export of POL to SAARC
- Page 185 and 186:
Action items Authorities concerned
- Page 187:
8. Skill development 9. Infrastruct
- Page 190 and 191:
8.2 Educational facilities availabl
- Page 192 and 193:
Table 129: Team composition during
- Page 194 and 195:
Table 132: List of courses for ITI
- Page 196 and 197:
Table 135: List of courses for ITI
- Page 198 and 199:
Table 137: List of courses for ITI
- Page 200 and 201:
stake in the project, the state gov
- Page 202 and 203:
8.9.2 Action plan Table 142: Action
- Page 204 and 205:
Double-laning of NH 44 needs to be
- Page 206 and 207:
9.2 Action plan Table 143: Action p
- Page 208 and 209:
Action items Authority concerned Sh
- Page 210 and 211:
Hon'ble PM of India Shri Narendra M
- Page 212 and 213:
Myanmar has proven oil reserves (on
- Page 214 and 215:
11.4 Bhutan Bhutan has no natural p
- Page 216 and 217:
12. Make in India The ‘Make in In
- Page 218 and 219:
Numaligarh Refinery Ltd has already
- Page 221 and 222:
13. Health/medical services 14. Cor
- Page 223 and 224:
National Iron+ initiative: To addre
- Page 225 and 226:
Education and Training by NRL NRL h
- Page 227:
15. Immediate Term Initiatives 16.
- Page 230 and 231:
identified locations for setting up
- Page 232 and 233:
State New location Product Tankage
- Page 234 and 235:
15.4.2 Make in India Review and fea
- Page 236 and 237:
Generate employment opportunities t
- Page 238 and 239:
17.3 Manipur Production of oil & ga
- Page 241 and 242:
18. Appendix Annexure I - XV
- Page 243 and 244:
18.2 State-specific issues 18.2.1 A
- Page 245 and 246:
18.2.5 Mizoram Infrastructure gap N
- Page 247 and 248:
Acronym HPCL HSD HVDC IAF IIITAS II
- Page 249 and 250:
Annexure II: Demographic and macroe
- Page 251 and 252:
Annexure IV: Service hubs World exa
- Page 253 and 254:
Annexure VI: National gas grid Nati
- Page 255 and 256:
Future investment plans The contrac
- Page 257 and 258:
After BCPL project goes into produc
- Page 259 and 260:
Annexure IX: Cash flow analysis for
- Page 261 and 262:
Annexure XI: Analysis of revenue to
- Page 263 and 264:
Blocks of ONGC where work is held u
- Page 265 and 266:
State Block Issue Arunachal Pradesh
- Page 267 and 268:
Annexure XIV: Days Coverage of petr