Table 129: Team composition during development drilling<br />

Team composition during drilling<br />

Numbers<br />

Drilling superintendent (rig manager) 1<br />

Tool pusher 2<br />

Driller 4<br />

Asst driller 4<br />

Derricman 4<br />

Oil well cementer 2<br />

Roughnecks 16<br />

Crane operator 4<br />

Roustabout 20<br />

Chief mechanic 2<br />

Chief electrician 2<br />

Welder 2<br />

Motorman 4<br />

Electrician 2<br />

Geologist 8<br />

Geophysicist 2<br />

Production engineer 4<br />

Reservoir engineer. 8<br />

Mud logger 4<br />

Driller 2<br />

Source: CRISIL Infrastructure Advisory Analysis<br />

Table 130: Team composition during production/processing<br />

Team composition during production<br />

Number<br />

Geologist 12<br />

Geophysicist 4<br />

Drilling engineer 12<br />

Geochemist 4<br />

Production engineer 16<br />

Reservoir engineer 16<br />

Logger 8<br />

Chemical engineer 2<br />

Production engineer 10<br />

Mechanical engineer 4<br />

Electrical engineer 4<br />

Fire & safety engineer 1<br />

Corrosion engineer 1<br />

Instrumentation engineer 2<br />

Technicians 96<br />

Geologist 2<br />

Geophysicist 1<br />

Reservoir engineer 4<br />

Production engineer 2<br />

Source: CRISIL Infrastructure Advisory Analysis<br />