03.10.2019 Views

GSLP-Liberals-Manifesto-2019

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

uilt in this period will be St Joseph’s<br />

First and Middle schools which were<br />

developed by the <strong>GSLP</strong> between 1988<br />

and 1996. This is a legacy which we<br />

are very, very proud of.<br />

THE NEW ST MARY’S<br />

We will provide a new St Mary’s School<br />

in the area of Town Range. We will<br />

complete the new St Mary’s School<br />

early in 2021. The current building is<br />

proving too small for the purposes of<br />

the catchment area. Additionally, it has<br />

not been possible to stop the water<br />

ingress problem the school faces from<br />

water flows from the Upper Town and<br />

Upper Rock area. It is essential that the<br />

pupils, teachers and staff of this school<br />

are properly provided for in a new<br />

facility. For that reason, we have agreed<br />

in principle to provide this school in<br />

a plot further south on Town Range<br />

itself. We will, in the interim, also take<br />

all necessary steps to minimise and,<br />

where possible, eradicate or manage<br />

the various difficulties being endured<br />

at this old school.<br />

THE NEW HEBREW SCHOOL<br />

Once St Mary’s has moved to its new<br />

location, we will move the existing<br />

Hebrew School out of its current site<br />

on Bomb House Lane to the site of<br />

a totally refurbished old St Mary’s.<br />

The building will need to be totally<br />

gutted and renewed, but the site is<br />

perfect and able to accommodate the<br />

numbers which, in consultation with<br />

the Managing Board of the Jewish<br />

Community, we believe we will need<br />

to cater for in coming decades.<br />

THE NEW ST MARTIN’S<br />

The <strong>GSLP</strong> <strong>Liberals</strong> were the only party<br />

committed to a new St Martin’s School<br />

at the last election. We have already<br />

started work on the new school. We<br />

expect it will be completed by the end<br />

of this year and will be in use by the first<br />

quarter of next year. This school has<br />

been designed with the most modern<br />

standards and facilities in mind for the<br />

pupils of St Martin’s. It will be a huge<br />

step forward for a school that has now<br />

totally outgrown its current home. The<br />

current site of St Martin’s will become<br />

a park for the North District.<br />

94 ...aspire to the best Gibraltar<br />

THE NEW BISHOP FITZGERALD &<br />

GOVERNOR’S MEADOW<br />

These two new schools will be ready<br />

for occupation at the start of next year.<br />

The demolition of the existing facilities<br />

will have to be done sensitively to<br />

ensure that any asbestos is properly<br />

contained. The designs are being<br />

delivered, as with the other magnificent<br />

new schools we have already opened,<br />

in close consultation with the teaching<br />

body of these schools.<br />

SCHOOL UPGRADES<br />

At the same time we will upgrade<br />

those schools that will not be moving<br />

to the new standards that we have<br />

set in educational establishments in<br />

Gibraltar. This means that works will<br />

be undertaken outside of term time at<br />

both St Joseph’s schools to ensure that<br />

the children who attend those schools<br />

benefit from the same facilities as<br />

those in the new schools. Already,<br />

we are retro-fitting air conditioning to<br />

these schools.<br />

SCHOOL MAINTENANCE<br />

We will ensure that all the schools<br />

have a full professional maintenance<br />

programme and facilities management<br />

so that they remain in excellent<br />

condition throughout their projected<br />

lifespan.<br />

TEACHING AND LEARNING<br />

We will continue to evolve our teaching<br />

and learning, incorporating aspects<br />

of the world famous Finnish model<br />

in order to arrive at the best possible<br />

education system for Gibraltar, with an<br />

emphasis on motivating children and<br />

young people to improve and maximise<br />

their abilities rather than compete with<br />

their friends and peers.<br />

PROJECT BASED LEARNING<br />

We will build on the success of projectbased<br />

learning and consolidate it into<br />

our schools.<br />

ENVIRONMENTAL EDUCATION<br />

We will continue to promote<br />

environmental education including<br />

climate change education throughout<br />

the school curriculum and will train<br />

teachers specifically in Climate<br />

Change.<br />

VOCATIONAL SUBJECTS<br />

We will expand the range of vocational<br />

options available at the Secondary<br />

schools and the College, providing<br />

opportunities for non-academic<br />

subjects and alternative vocational<br />

routes for other subjects such as<br />

music and performing arts and Digital<br />

Technology.<br />

EDUCATIONAL TRAINEESHIPS<br />

We will provide the new educational<br />

traineeships in a wide range of<br />

subjects including hairdressing,<br />

entrepreneurship, hostelry and<br />

catering, computing, and the more<br />

traditional trades.<br />

TABLET BASED LEARNING<br />

We will, within one academic cycle<br />

complete the roll-out of the tabletbased<br />

learning programme.<br />

SPECIAL NEEDS<br />

We will continue to provide for children<br />

with special needs in an inclusive<br />

manner, with full time SENCOs,<br />

while having additional appropriate<br />

learning support facilities in every<br />

school. We will expand this provision<br />

as necessary to be able to ensure that<br />

all children with educational needs,<br />

including those with high performance<br />

capabilities, are able to attain their full<br />

potential.<br />

DEAF TEACHING<br />

We will recruit and train a teacher for<br />

the deaf and will provide a trained<br />

Learning Support Assistant for the<br />

deaf when required.<br />

ARABIC & MANDARIN<br />

We will introduce the teaching of<br />

Arabic & Mandarin as an option at the<br />

College and the Comprehensives.<br />

MENTAL HEALTH IN SCHOOLS<br />

We have added counsellors in our<br />

Comprehensive Schools. We will<br />

continue to build a school model for<br />

supporting mental health, and social<br />

and emotional wellbeing in education.<br />

We will increase the number of<br />

education psychologists by an<br />

additional two posts and will increase<br />

the number of school counsellors<br />

from four to six. We will continue<br />

and enhance training of teachers on<br />

positive mental health.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!