Assabet River NWR Final CCP - U.S. Fish and Wildlife Service
Assabet River NWR Final CCP - U.S. Fish and Wildlife Service
Assabet River NWR Final CCP - U.S. Fish and Wildlife Service
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Eastern Massachusetts National <strong>Wildlife</strong> Refuge Complex Draft <strong>CCP</strong>/EA November, 2003<br />
12300 Range of Issues Identified through Public Scoping (General; Comments<br />
specific to resource areas go to AFFEC)<br />
12400 Issues <strong>and</strong> Concerns Considered Outside the Scope of This Analysis<br />
12500 Permits <strong>and</strong> Agency Approvals Required<br />
12600 Guiding Policy for Public L<strong>and</strong>s (General l<strong>and</strong> management philosophies)<br />
ALTER - Alternatives - Chapter 2<br />
13000 Alternatives (Comments that simply vote, without rationale)<br />
13100 Alternative A: Current Management (General comments not specific to a<br />
resource; Assumptions made in the analysis)<br />
13200 Alternative B: Proposed Action<br />
13300 Alternative C<br />
13400 Formulating Alternatives (Issues used, Design criteria, Development, etc.)<br />
13500 Features common to all Alternatives<br />
13600 Features common to Action Alternatives only (B & C)<br />
13700 Alternatives Considered But Not Given Detailed Study (Same as eliminated<br />
alternatives)<br />
13800 Range/Comparison of Alternatives (General comments, adequacy of range; I<br />
like A &C better than B)<br />
13900 New Alternatives (Support for or recommendation for a new one)<br />
13910 Alternative Matrices (Including Map comments <strong>and</strong> references)<br />
AFFEC - Affected Environment - Chapter 3, <strong>and</strong><br />
Environmental Consequences - Chapter 4<br />
14000 Physical, Biological, <strong>and</strong> Socio-Economic Resources (general<br />
Climate comments, extensive lists)<br />
15000 Geology/Topography<br />
16000 Soils<br />
15100 Analysis of Existing Conditions <strong>and</strong> Need for Further Analysis<br />
15200 General Management Direction (including other Management Impacts on this<br />
Resource)<br />
15300 Cumulative Impacts<br />
15400 Mitigation <strong>and</strong> Monitoring<br />
16100 Analysis of Existing Conditions <strong>and</strong> Need for Further Analysis<br />
16200 General Management Direction (including other Management Impacts on this<br />
Resource)<br />
16300 Cumulative Impacts<br />
16400 Mitigation <strong>and</strong> Monitoring<br />
Appendix C: Demographics A-2