Assabet River NWR Final CCP - U.S. Fish and Wildlife Service
Assabet River NWR Final CCP - U.S. Fish and Wildlife Service
Assabet River NWR Final CCP - U.S. Fish and Wildlife Service
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Appendix E: RONS <strong>and</strong> MMS<br />
Appendix E: RONS <strong>and</strong> MMS<br />
The Refuge Operations Needs System (RONS) lists refuge projects over $20,000. The<br />
Management Maintenance System (MMS) identifies maintenace needs on refuges.<br />
Projects on both lists are prioritized <strong>and</strong> initated as funding becomes available. Funding is<br />
allocated through the <strong>Service</strong>’s Northeast Regional Office <strong>and</strong> is based on Congressional<br />
appropriation to the service.<br />
Project: this list includes projects currently in the RONS database <strong>and</strong> projects proposed<br />
in the <strong>CCP</strong>.<br />
FTE: full time staffing equivalent. One fte equals one person working full time for one<br />
whole year; seasonal employees are considered 0.5 fte. (note: staff are often “shared” by<br />
multiple rons projects)<br />
Cost, year 1: estimated costs incurred during the first year of a project - typically higher<br />
than recurring costs, due to construction, equipment purchase, or other start-up expenses.<br />
Cost, recurring: estimated average annual project cost for subsequent years; includes<br />
recurring salary <strong>and</strong> maintenance costs.<br />
Project duration: estimated length of time for each project. Since this <strong>CCP</strong> will be revised<br />
in 15 years, the “maximum project duration” is 15 years, even though some projects may<br />
continue into the next planning cycle<br />
Table E-1: Projects Currently in the RONS Database <strong>and</strong> Proposed Projects to be included for<br />
<strong>Assabet</strong> <strong>River</strong> <strong>NWR</strong><br />
Project FTE Startup<br />
cost<br />
Oversee refuge management, planning,<br />
programs, administration <strong>and</strong> maintenance<br />
Provide wildlife <strong>and</strong> habitat management<br />
planning, implementation, <strong>and</strong> evaluation<br />
Collect essential biological data to<br />
efficiently manage the refuge<br />
Develop <strong>and</strong> implement a forestry<br />
management plan<br />
Provide planning <strong>and</strong> implementation of<br />
wildlife-dependent public use programs<br />
GS 11<br />
Refuge<br />
Ops.<br />
Spec.<br />
GS 11<br />
<strong>Wildlife</strong><br />
Biologist<br />
GS 7<br />
Biol.<br />
GS 11<br />
Forester<br />
GS 11<br />
Outdoor<br />
Rec.<br />
Planner<br />
Annual Duration<br />
cost (years)<br />
x1,000 x 1,000<br />
139 74 15<br />
133 68 15<br />
114 49 15<br />
133 68 15<br />
133 68 15<br />
Comprehencive Conservation Plan - 201 -