Assabet River NWR Final CCP - U.S. Fish and Wildlife Service
Assabet River NWR Final CCP - U.S. Fish and Wildlife Service
Assabet River NWR Final CCP - U.S. Fish and Wildlife Service
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Chapter 5: Refuge Administration<br />
After the new Visitor Center is built, the current headquarters on Weir Hill<br />
Road will be used for administrative purposes only by refuge staff.<br />
Step-Down Management Plans<br />
The Refuge Manual (Part 4, Chapter 3) lists a number of step-down<br />
management plans generally required on most refuges. These plans<br />
describe specific management actions refuges will follow to achieve<br />
objectives or implement management strategies. Some require annual<br />
revisions, such as hunt plans, while others are revised on a 5-to-10 year<br />
schedule. Some of these plans require NEPA analysis before they can be<br />
implemented. In the case of the Complex, some of the plans are developed<br />
for each refuge, while some plans are developed for the Complex with<br />
specific sections that pertain to individual refuges. In the following lists, we<br />
have identified those plans that are specific to the refuge <strong>and</strong> those that will<br />
be included in an overall Complex plan.<br />
The following plans are either up-to-date or in progress <strong>and</strong> will be<br />
completed within 1-year of issuance of the <strong>CCP</strong>.<br />
� Habitat Management Plan (Refuge)<br />
� Fire Management Plan (Complex)<br />
� Spill Prevention <strong>and</strong> Counter Measure Plan (Complex)<br />
� Law Enforcement Management Plan (Complex)<br />
The plans indicated in the following list either need to be initiated or are<br />
out-of-date <strong>and</strong> require complete revision. Additional management plans<br />
may be required as future <strong>Service</strong> policy dictates.<br />
� Habitat <strong>and</strong> <strong>Wildlife</strong> Inventory Plan (Refuge)<br />
� Integrated Pest Management Plan (Complex)<br />
� Visitor <strong>Service</strong>s Plan (Complex)<br />
� Energy Contingency Plan (Complex)<br />
� Hunt Plan (Refuge)<br />
� <strong>Fish</strong>ing Plan (Refuge)<br />
� Cultural Resources Management Plan (Complex)<br />
� Migratory Bird Disease Contingency Plan (Complex)<br />
� Safety Management Plan (Complex)<br />
� Continuity of Operations Plan (Complex)<br />
� Sign Plan (Complex)<br />
Maintaining Existing Facilities<br />
Periodic maintenance of existing facilities is critical to ensure safety <strong>and</strong><br />
accessibility for Complex staff <strong>and</strong> visitors. There are no usable facilities<br />
that exist at the refuge for staff or visitors. Complex facilities that relate to<br />
<strong>Assabet</strong> <strong>River</strong> include the Great Meadows <strong>NWR</strong> visitor contact station <strong>and</strong><br />
Comprehensive Conservation Plan - 67 -