2011 Algae Platform Review – <strong>Reviewer</strong> <strong>Comments</strong><br />

<strong>Reviewer</strong> <strong>Comments</strong> are direct transcripts of commentary and material provided by the Platform’s<br />

Review Panel. They have not been edited or altered by the Biomass Program.<br />

2. Technical Progress and Accomplishments<br />

Please evaluate the degree to which the project has<br />

made progress in its objectives and stated project management plan<br />

has met its objectives in achieving milestones and overcoming technical barriers<br />

<strong>Reviewer</strong> <strong>Comments</strong><br />

<strong>Reviewer</strong>: 1 Criteria Score: 5<br />

Project is moving at an acceptable pace.<br />

<strong>Reviewer</strong>: 2 Criteria Score: 8<br />

The project has good partners and practical goals that are being approached well.<br />

<strong>Reviewer</strong>: 3 Criteria Score: 5<br />

• Developed and tested sample preparation and analysis methods • Developed host and background<br />

subtraction reagents • Developed agent isolation methods<br />

<strong>Reviewer</strong>: 4 Criteria Score: 8<br />

Some tasks have been completed.<br />

<strong>Reviewer</strong>: 5 Criteria Score: 5<br />

Progress is limited because the project just began (October 2010).<br />

<strong>Reviewer</strong>: 6 Criteria Score: 5<br />

New project so difficult to judge. Much more information could have been given (and defended) as to the<br />

development of the methods applied.<br />

<strong>Reviewer</strong>: 7 Criteria Score: 5<br />

It is early in project.<br />

Presenter Response<br />

The project team would like to have presented more technical detail but were limited by the required<br />

format and time allotted for the presentation. We have made significant progress in the development of<br />

positive controls and in house culture systems as a source of materials for analysis. We have obtained and<br />

are analyzing samples from an number of parallel pilot scale ponds. We are refining our methods to<br />

accommodate the use of frozen samples to ensure sample stability during shipment.<br />

3. Project Relevance<br />

The project both identifies with and contributes to meeting the platform goals and objectives of the<br />

Biomass Program Multi-Year Program Plan<br />

The project has considered applications of the expected outputs<br />

<strong>Reviewer</strong> <strong>Comments</strong><br />

<strong>Reviewer</strong>: 1 Criteria Score: 5<br />

The relevance is somewhat apparent if it is actually used to promote the scale-up of production. The<br />

investigators need to be sure they do not place hemselves in the position of promoting a methodology or<br />

technique and looking for a problem. Some partnering with pond operators is desirable.<br />