17.01.2013 Views

Reviewer Comments - EERE

Reviewer Comments - EERE

Reviewer Comments - EERE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2011 Algae Platform Review – <strong>Reviewer</strong> <strong>Comments</strong><br />

<strong>Reviewer</strong> <strong>Comments</strong> are direct transcripts of commentary and material provided by the Platform’s<br />

Review Panel. They have not been edited or altered by the Biomass Program.<br />

<strong>Reviewer</strong> <strong>Comments</strong><br />

<strong>Reviewer</strong>: 1 Criteria Score: 5<br />

Some listing of legitimate CSFs was presented.<br />

<strong>Reviewer</strong>: 2 Criteria Score: 5<br />

A strong management structure that links PI's goals and ensures a focus on end goals is critical (and was<br />

not apparent from presentation).<br />

<strong>Reviewer</strong>: 3 Criteria Score: 8<br />

Critical success factors to technical and commercial viability: Integration of research projects with<br />

commercial partners. Achieve milestones and deliverable on time. Continuous review of projects to retain<br />

commercial relevance. Potential Challenges to overcome and to achieve project results: With 21 academic<br />

participants, communication between labs and commercial partners will be essential. With only two<br />

industrial partners, commercial research focus will be much easier to mamage. Demonstrate how project<br />

will advance the commercial viability of biomass: Sapphire projects are directly tied to viability of first<br />

integrated algal biorefinery - due to start operations in 2012. Life Technology projects will enter market<br />

as research tools in 2011.<br />

<strong>Reviewer</strong>: 5 Criteria Score: 5<br />

Unfortunately, there were no detailed descriptions about how achievement of milestones will change or<br />

not change goals<br />

or collaborations between laboratories.<br />

<strong>Reviewer</strong>: 6 Criteria Score: 5<br />

See Overall Impressions<br />

<strong>Reviewer</strong>: 7 Criteria Score: 3<br />

No evidence of indentification of critical factors as defined above was presented.<br />

Presenter Response<br />

5. Technology Transfer and Collaborations<br />

Please comment on the degree to which the project adequately interfaces and coordinates with other<br />

institutions and projects to provide additional benefits to the Biomass Program, such as publications,<br />

awards, or others.<br />

<strong>Reviewer</strong> <strong>Comments</strong><br />

<strong>Reviewer</strong>: 1<br />

Coordination will be one of the big challenges for this program.<br />

<strong>Reviewer</strong>: 2<br />

Just starting.<br />

<strong>Reviewer</strong>: 3<br />

CAB-Comm works closely with Sapphire Energy in the area of Tech transfer<br />

Page 36 of 223

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!