Reviewer Comments - EERE
Reviewer Comments - EERE
Reviewer Comments - EERE
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
2011 Algae Platform Review – <strong>Reviewer</strong> <strong>Comments</strong><br />
<strong>Reviewer</strong> <strong>Comments</strong> are direct transcripts of commentary and material provided by the Platform’s<br />
Review Panel. They have not been edited or altered by the Biomass Program.<br />
<strong>Reviewer</strong> <strong>Comments</strong><br />
<strong>Reviewer</strong>: 1 Criteria Score: 5<br />
Some listing of legitimate CSFs was presented.<br />
<strong>Reviewer</strong>: 2 Criteria Score: 5<br />
A strong management structure that links PI's goals and ensures a focus on end goals is critical (and was<br />
not apparent from presentation).<br />
<strong>Reviewer</strong>: 3 Criteria Score: 8<br />
Critical success factors to technical and commercial viability: Integration of research projects with<br />
commercial partners. Achieve milestones and deliverable on time. Continuous review of projects to retain<br />
commercial relevance. Potential Challenges to overcome and to achieve project results: With 21 academic<br />
participants, communication between labs and commercial partners will be essential. With only two<br />
industrial partners, commercial research focus will be much easier to mamage. Demonstrate how project<br />
will advance the commercial viability of biomass: Sapphire projects are directly tied to viability of first<br />
integrated algal biorefinery - due to start operations in 2012. Life Technology projects will enter market<br />
as research tools in 2011.<br />
<strong>Reviewer</strong>: 5 Criteria Score: 5<br />
Unfortunately, there were no detailed descriptions about how achievement of milestones will change or<br />
not change goals<br />
or collaborations between laboratories.<br />
<strong>Reviewer</strong>: 6 Criteria Score: 5<br />
See Overall Impressions<br />
<strong>Reviewer</strong>: 7 Criteria Score: 3<br />
No evidence of indentification of critical factors as defined above was presented.<br />
Presenter Response<br />
5. Technology Transfer and Collaborations<br />
Please comment on the degree to which the project adequately interfaces and coordinates with other<br />
institutions and projects to provide additional benefits to the Biomass Program, such as publications,<br />
awards, or others.<br />
<strong>Reviewer</strong> <strong>Comments</strong><br />
<strong>Reviewer</strong>: 1<br />
Coordination will be one of the big challenges for this program.<br />
<strong>Reviewer</strong>: 2<br />
Just starting.<br />
<strong>Reviewer</strong>: 3<br />
CAB-Comm works closely with Sapphire Energy in the area of Tech transfer<br />
Page 36 of 223