20.01.2013 Views

Tactics, techniques, and procedures for - Army Electronic ...

Tactics, techniques, and procedures for - Army Electronic ...

Tactics, techniques, and procedures for - Army Electronic ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FM 42-414<br />

protection <strong>for</strong> over <strong>and</strong> undergarments will allow at least four washings, be<strong>for</strong>e being exposed to any<br />

contaminations, <strong>and</strong> still provide protection from chemical agents.<br />

EPA implementation is initiated by following --<br />

EPA Regulations In The United States. Rules <strong>and</strong> regulations <strong>for</strong> wastewater discharges are set by<br />

the EPA or a state with an EPA-approved program under the NPDES, established under the CWA. The<br />

NPDES sets minimum treatment st<strong>and</strong>ards <strong>for</strong> surface waters discharges. It also sets up the framework <strong>for</strong><br />

setting more discharge st<strong>and</strong>ards. For disposal of discharges, apply <strong>for</strong> <strong>and</strong> obtain an NPDES permit (or<br />

state equivalent), which contains discharge st<strong>and</strong>ards <strong>and</strong> restrictions that apply to the given discharge.<br />

Be<strong>for</strong>e operating any S/L elements in the United States, check with the state <strong>and</strong> local EPA <strong>for</strong> permit(s)<br />

requirements.<br />

*Figure 1-2. Proposed wire net <strong>for</strong> QM field service company ( modular)<br />

*(NOTE: QM FSC, DS <strong>and</strong> QM FSC, M are authorized TA-312/PT telephone sets.)<br />

1-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!