Permen PU 45 2007
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
TABEL B2
PROSENTASE KOMPONEN BIAYA PEMBANGUNAN
BANGUNAN GEDUNG NEGARA KLASIFIKASI TIDAK SEDERHANA
TIDAK SEDERHANA
BIAYA KONSTRUKSI FISIK
(JUTA RP)
250 500 1,000 2,500 5,000 10,000 25,000 50,000 100,000 250,000
s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.
KOMPONEN 250 500 1,000 2,500 5,000 10,000 25,000 50,000 100,000 250,000 500,000
KEGIATAN
1 2 3 4 5 6 7 8 9 10 11 12
1. PERENCANAAN 9.00 7.55 6.35 5.37 4.55 3.92 3.42 3.02 2.72 2.50
KONSTRUKSI 9.00 s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.
(dalam %) 7.55 6.35 5.37 4.55 3.92 3.42 3.02 2.72 2.50 2.32
96
2. MANAJEMEN 7.25 6.20 5.25 4.50 3.80 3.25 2.80 2.48 2.19 2.00
KONSTRUKSI 7.25 s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.
(dalam %) 6.20 5.25 4.50 3.80 3.25 2.80 2.48 2.19 2.00 1.89
atau
3. PENGAWASAN 6.00 5.20 4.45 3.80 3.20 2.70 2.30 2.00 1.78 1.60
KONSTRUKSI 6.00 s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.
(dalam %) 5.20 4.45 3.80 3.20 2.70 2.30 2.00 1.78 1.60 1.50
4. PENGELOLAAN 16.00 11.25 7.75 5.10 3.28 2.15 1.42 0.93 0.58 0.31
KEGIATAN 16.00 s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.
(dalam %) 11.25 7.75 5.10 3.28 2.15 1.42 0.93 0.58 0.31 0.19