TABEL B3

PROSENTASE KOMPONEN BIAYA PEMBANGUNAN

BANGUNAN GEDUNG NEGARA KLASIFIKASI KHUSUS

KHUSUS

BIAYA KONSTRUKSI FISIK

(JUTA RP)

250 500 1,000 2,500 5,000 10,000 25,000 50,000 100,000 250,000

s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.

KOMPONEN 250 500 1,000 2,500 5,000 10,000 25,000 50,000 100,000 250,000 500,000

KEGIATAN

1 2 3 4 5 6 7 8 9 10 11 12

97

1. PERENCANAAN 9.75 8.20 6.89 5.85 5.00 4.35 3.85 3.45 3.10 2.90

KONSTRUKSI 9.75 s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.

(dalam %) 8.20 6.89 5.85 5.00 4.35 3.85 3.45 3.10 2.90 2.75

2. MANAJEMEN 7.95 6.68 5.70 4.87 4.15 3.60 3.10 2.77 2.49 2.30

KONSTRUKSI 7.95 s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.

(dalam %) 6.68 5.70 4.87 4.15 3.60 3.10 2.77 2.49 2.30 2.17

3 PENGELOLAAN 16.00 11.25 7.75 5.10 3.28 2.15 1.42 0.93 0.58 0.31

KEGIATAN 16.00 s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.

(dalam %) 11.25 7.75 5.10 3.28 2.15 1.42 0.93 0.58 0.31 0.19