TABEL B3
PROSENTASE KOMPONEN BIAYA PEMBANGUNAN
BANGUNAN GEDUNG NEGARA KLASIFIKASI KHUSUS
KHUSUS
BIAYA KONSTRUKSI FISIK
(JUTA RP)
250 500 1,000 2,500 5,000 10,000 25,000 50,000 100,000 250,000
s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.
KOMPONEN 250 500 1,000 2,500 5,000 10,000 25,000 50,000 100,000 250,000 500,000
KEGIATAN
1 2 3 4 5 6 7 8 9 10 11 12
97
1. PERENCANAAN 9.75 8.20 6.89 5.85 5.00 4.35 3.85 3.45 3.10 2.90
KONSTRUKSI 9.75 s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.
(dalam %) 8.20 6.89 5.85 5.00 4.35 3.85 3.45 3.10 2.90 2.75
2. MANAJEMEN 7.95 6.68 5.70 4.87 4.15 3.60 3.10 2.77 2.49 2.30
KONSTRUKSI 7.95 s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.
(dalam %) 6.68 5.70 4.87 4.15 3.60 3.10 2.77 2.49 2.30 2.17
3 PENGELOLAAN 16.00 11.25 7.75 5.10 3.28 2.15 1.42 0.93 0.58 0.31
KEGIATAN 16.00 s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d. s.d.
(dalam %) 11.25 7.75 5.10 3.28 2.15 1.42 0.93 0.58 0.31 0.19