23.02.2013 Views

【User Manual】 Lite-Puter Enterprise Co., Ltd. - Notape

【User Manual】 Lite-Puter Enterprise Co., Ltd. - Notape

【User Manual】 Lite-Puter Enterprise Co., Ltd. - Notape

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ISO 9001 CERTIFIED www.liteputer.com.tw<br />

3-2 Hardware inspection<br />

Inspection function include: 82 LED indicators check<br />

91 buttons check<br />

21 Fader and 1 joystick check<br />

82 LED indicators check<br />

STEP-1 Press both【ENTER】 and【ESC】 at meantime switch on CX-18, LCD displays as below,<br />

At this time , the 82 LED indicators will turn on(if not, it means the LED is broken)<br />

91 buttons check<br />

STEP-2 After LED inspection, system will automatically enter button check, LCD displays<br />

as below,<br />

LITE-PUTER CX-18 Ver1.0 BANK:01<br />

TEST I/O & LED FUNCTION<br />

[STEP1] LEDS TEST END<br />

[STEP2] TEST KEYS, PRESS KEY TO TEST<br />

[STEP3] TEST VR, CHANGE VR FOR TEST<br />

PRESS’ESC’ EXIT TEST<br />

PRESS’ENTER’ NEXT STEP<br />

INTER MEMORY 08/01/2008 10:08<br />

LITE-PUTER CX-18 Ver1.0 BANK:01<br />

TEST I/O & LED FUNCTION<br />

[STEP1] LEDS TEST END<br />

[STEP2] TEST KEYS, PRESS KEY TO TEST<br />

[STEP3] TEST VR, CHANGE VR FOR TEST<br />

PRESS’ESC’ EXIT TEST<br />

PRESS’ENTER’ NEXT STEP<br />

INTER MEMORY 08/01/2008 10:08<br />

14<br />

Reminder<br />

Reminder<br />

<strong>Lite</strong>-<strong>Puter</strong><br />

CX-18 [EUM-D]

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!