【User Manual】 Lite-Puter Enterprise Co., Ltd. - Notape
【User Manual】 Lite-Puter Enterprise Co., Ltd. - Notape
【User Manual】 Lite-Puter Enterprise Co., Ltd. - Notape
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
ISO 9001 CERTIFIED www.liteputer.com.tw<br />
3-2 Hardware inspection<br />
Inspection function include: 82 LED indicators check<br />
91 buttons check<br />
21 Fader and 1 joystick check<br />
82 LED indicators check<br />
STEP-1 Press both【ENTER】 and【ESC】 at meantime switch on CX-18, LCD displays as below,<br />
At this time , the 82 LED indicators will turn on(if not, it means the LED is broken)<br />
91 buttons check<br />
STEP-2 After LED inspection, system will automatically enter button check, LCD displays<br />
as below,<br />
LITE-PUTER CX-18 Ver1.0 BANK:01<br />
TEST I/O & LED FUNCTION<br />
[STEP1] LEDS TEST END<br />
[STEP2] TEST KEYS, PRESS KEY TO TEST<br />
[STEP3] TEST VR, CHANGE VR FOR TEST<br />
PRESS’ESC’ EXIT TEST<br />
PRESS’ENTER’ NEXT STEP<br />
INTER MEMORY 08/01/2008 10:08<br />
LITE-PUTER CX-18 Ver1.0 BANK:01<br />
TEST I/O & LED FUNCTION<br />
[STEP1] LEDS TEST END<br />
[STEP2] TEST KEYS, PRESS KEY TO TEST<br />
[STEP3] TEST VR, CHANGE VR FOR TEST<br />
PRESS’ESC’ EXIT TEST<br />
PRESS’ENTER’ NEXT STEP<br />
INTER MEMORY 08/01/2008 10:08<br />
14<br />
Reminder<br />
Reminder<br />
<strong>Lite</strong>-<strong>Puter</strong><br />
CX-18 [EUM-D]