02.03.2013 Views

We are pleased to present this book which showcases ... - WSP Group

We are pleased to present this book which showcases ... - WSP Group

We are pleased to present this book which showcases ... - WSP Group

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

10<br />

PROPERTY<br />

City of Arabia, Dubai<br />

THE WORLD’S BIGGEST SHOPPING MALL<br />

Dubailand is a 400 million sq m development of over 45 sporting,<br />

leisure and commercial attractions, <strong>which</strong> re<strong>present</strong>s an integral part<br />

of Dubai’s vision <strong>to</strong> become the major <strong>to</strong>urist destination of the<br />

Middle East.At its heart an exciting and imaginative residential and<br />

commercial district is being planned as a major draw for <strong>to</strong>urists in<br />

the region.<br />

City of Arabia will have the world’s biggest shopping mall, a dinosaur<br />

theme park, hotels, community buildings, high rise <strong>to</strong>wers and over<br />

2000 apartments in a low-rise development around a spectacular<br />

water feature.<br />

<strong>WSP</strong> is providing full building services and structural design for the<br />

entire development, whose special features <strong>are</strong> providing the design<br />

team with some interesting and unusual challenges.The sheer physical<br />

size of the shopping mall, Mall of Arabia, calls for the most efficient<br />

solutions in the most exacting detail.With one million sq m of retail<br />

space and around 1200 outlets, even an app<strong>are</strong>ntly small saving in<br />

installation costs is multiplied many times in reality, resulting in<br />

substantial savings overall. Once the buildings <strong>are</strong> operational,<br />

air conditioning will be by far the largest energy expense.<strong>WSP</strong>’s<br />

designers <strong>are</strong> therefore working closely with the architects <strong>to</strong> ensure<br />

that the building design is as efficient as possible both in its structure<br />

and in the integration of the services within the building envelope.<br />

Wadi Walk is a man-made water feature with an overall <strong>are</strong>a<br />

of over 70 000 sq m, intended as a focal point for the surrounding<br />

accommodation.The problem of Dubai’s high ambient temperatures,<br />

coupled with the requirement <strong>to</strong> maintain near pure water <strong>which</strong> is<br />

safe for people but without the aroma or look of a swimming pool,<br />

called for a sophisticated, bespoke design solution.<br />

<strong>WSP</strong> <strong>are</strong> now working on the first four Elite Towers, comprising<br />

two 45-s<strong>to</strong>rey and two 30-s<strong>to</strong>rey residential and commercial <strong>to</strong>wers.<br />

<strong>WSP</strong> is also designing the “Restless Planet”, a 50 000 sq m, fully<br />

air-conditioned attraction with 34 different species of dinosaur<br />

programmed <strong>to</strong> move and roar in a prehis<strong>to</strong>ric world brought<br />

<strong>to</strong> life with digital sound and images.<br />

Client:<br />

Ilyas & Mustafa Galadari <strong>Group</strong><br />

Project team:<br />

Architects: P&T<br />

Project managers: Hill International<br />

Project value:<br />

Over £1300M<br />

Project size:<br />

In excess of 200,000 sq m<br />

Status:<br />

Phase 1 design <strong>to</strong> be completed by first quarter 2006<br />

Mall of Arabia and Restless Planet <strong>to</strong> open third quarter 2008<br />

<strong>WSP</strong> services:<br />

Building services design<br />

Structural design<br />

Development infrastructure design

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!