We are pleased to present this book which showcases ... - WSP Group
We are pleased to present this book which showcases ... - WSP Group
We are pleased to present this book which showcases ... - WSP Group
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
10<br />
PROPERTY<br />
City of Arabia, Dubai<br />
THE WORLD’S BIGGEST SHOPPING MALL<br />
Dubailand is a 400 million sq m development of over 45 sporting,<br />
leisure and commercial attractions, <strong>which</strong> re<strong>present</strong>s an integral part<br />
of Dubai’s vision <strong>to</strong> become the major <strong>to</strong>urist destination of the<br />
Middle East.At its heart an exciting and imaginative residential and<br />
commercial district is being planned as a major draw for <strong>to</strong>urists in<br />
the region.<br />
City of Arabia will have the world’s biggest shopping mall, a dinosaur<br />
theme park, hotels, community buildings, high rise <strong>to</strong>wers and over<br />
2000 apartments in a low-rise development around a spectacular<br />
water feature.<br />
<strong>WSP</strong> is providing full building services and structural design for the<br />
entire development, whose special features <strong>are</strong> providing the design<br />
team with some interesting and unusual challenges.The sheer physical<br />
size of the shopping mall, Mall of Arabia, calls for the most efficient<br />
solutions in the most exacting detail.With one million sq m of retail<br />
space and around 1200 outlets, even an app<strong>are</strong>ntly small saving in<br />
installation costs is multiplied many times in reality, resulting in<br />
substantial savings overall. Once the buildings <strong>are</strong> operational,<br />
air conditioning will be by far the largest energy expense.<strong>WSP</strong>’s<br />
designers <strong>are</strong> therefore working closely with the architects <strong>to</strong> ensure<br />
that the building design is as efficient as possible both in its structure<br />
and in the integration of the services within the building envelope.<br />
Wadi Walk is a man-made water feature with an overall <strong>are</strong>a<br />
of over 70 000 sq m, intended as a focal point for the surrounding<br />
accommodation.The problem of Dubai’s high ambient temperatures,<br />
coupled with the requirement <strong>to</strong> maintain near pure water <strong>which</strong> is<br />
safe for people but without the aroma or look of a swimming pool,<br />
called for a sophisticated, bespoke design solution.<br />
<strong>WSP</strong> <strong>are</strong> now working on the first four Elite Towers, comprising<br />
two 45-s<strong>to</strong>rey and two 30-s<strong>to</strong>rey residential and commercial <strong>to</strong>wers.<br />
<strong>WSP</strong> is also designing the “Restless Planet”, a 50 000 sq m, fully<br />
air-conditioned attraction with 34 different species of dinosaur<br />
programmed <strong>to</strong> move and roar in a prehis<strong>to</strong>ric world brought<br />
<strong>to</strong> life with digital sound and images.<br />
Client:<br />
Ilyas & Mustafa Galadari <strong>Group</strong><br />
Project team:<br />
Architects: P&T<br />
Project managers: Hill International<br />
Project value:<br />
Over £1300M<br />
Project size:<br />
In excess of 200,000 sq m<br />
Status:<br />
Phase 1 design <strong>to</strong> be completed by first quarter 2006<br />
Mall of Arabia and Restless Planet <strong>to</strong> open third quarter 2008<br />
<strong>WSP</strong> services:<br />
Building services design<br />
Structural design<br />
Development infrastructure design