We are pleased to present this book which showcases ... - WSP Group
We are pleased to present this book which showcases ... - WSP Group
We are pleased to present this book which showcases ... - WSP Group
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PROPERTY<br />
Aspen Pharmac<strong>are</strong>, South Africa<br />
NEW PLANT CELEBRATED FOR ITS DESIGN EXCELLENCE<br />
In 2002,Aspen Pharmac<strong>are</strong>,Africa’s largest pharmaceutical<br />
manufacturer, appointed <strong>WSP</strong> <strong>to</strong> undertake the building services<br />
design for a new Oral Solid Dosage (OSD) plant <strong>to</strong> be constructed<br />
next <strong>to</strong> Aspen’s existing pharmaceutical plant in the industrial <strong>are</strong>a of<br />
Korsten in Port Elizabeth, South Africa.The plant was <strong>to</strong> conform <strong>to</strong><br />
South African and European regula<strong>to</strong>ry standards <strong>to</strong> allow the plant<br />
<strong>to</strong> produce tablets for export <strong>to</strong> European countries.<br />
The quantity, quality and extent of the services in <strong>this</strong> building<br />
<strong>are</strong> extremely onerous, due <strong>to</strong> the exacting demands of the<br />
manufacturing process.Therefore the general layout and size<br />
of the structure were heavily influenced at concept design stage<br />
by the services requirements, resulting in a number of innovative<br />
and unique solutions.<br />
This extremely services-intensive project was completed on time<br />
and within budget, and the client was able <strong>to</strong> apply for and receive<br />
international certification for the plant from the US FDA (United<br />
States Food and Drug Administration), the UK MHRA (United<br />
Kingdom Medicines and Healthc<strong>are</strong> Regula<strong>to</strong>ry Authority) and the<br />
WHO (World Health Organisation). International audi<strong>to</strong>rs praised<br />
the plant’s quality of construction and systems, rating it as good as<br />
any other in the world.<br />
The achievement of USA FDA approval has enabled PEPFAR Funding<br />
(President’s Emergency Plan for AIDS Relief) <strong>to</strong> be made available <strong>to</strong><br />
purchase products from <strong>this</strong> plant.This has contributed <strong>to</strong> the plant<br />
already exceeding growth plans and a further similar plant is now<br />
being considered.<br />
Client:<br />
Aspen Pharmac<strong>are</strong><br />
Project team:<br />
Architects: Danie Bekker & Associates CC<br />
Main contrac<strong>to</strong>r: Grintaker LTA / Boshard J.V.<br />
Quantity surveyor: Randall, MacLennan & Potgieter<br />
<strong>WSP</strong> services:<br />
Building services design<br />
Fire engineering<br />
■ Main services plant rooms <strong>are</strong> centrally located <strong>to</strong> minimise<br />
lengths of services runs and spatial coordination issues;<br />
■ Vertical services runs between floors <strong>are</strong> separated by gratings <strong>to</strong><br />
allow flexibility for future changes. Fire protection design for <strong>this</strong><br />
“chimney” structure within a conventional masonry building was<br />
agreed with the local fire chief;<br />
■ Walk-in ceiling voids allow access <strong>to</strong> services <strong>which</strong>, due <strong>to</strong><br />
hygiene considerations, cannot be accessed from within the high<br />
cleanliness (Grade D) production <strong>are</strong>as;<br />
■ The Special requirements of the tablet compression <strong>are</strong>a preclude<br />
the use of walk-in ceiling voids for services maintenance. Services<br />
<strong>are</strong> therefore routed via adjacent <strong>are</strong>as where there is adequate<br />
ceiling void and a sealed but demountable metal pan ceiling, <strong>which</strong><br />
gives access <strong>to</strong> the ceiling void if absolutely necessary;<br />
■ A single 3000 kg capacity lift with separate and interlocked<br />
doors provides transport of raw materials, new equipment<br />
and maintenance equipment, with one side opening <strong>to</strong> plant<br />
and services spaces and the other <strong>to</strong> access production <strong>are</strong>as.<br />
Two lift lobbies per floor <strong>are</strong> separately air-conditioned and<br />
service the dual purpose of an air lock so pressure regimes<br />
can be maintained throughout;<br />
■ Air-conditioning ducting for Grade D systems was fabricated<br />
under closely controlled conditions then cleaned before being<br />
sealed for transportation <strong>to</strong> site;<br />
■ Air-conditioning parameters <strong>are</strong> maintained and logged, with<br />
sensors in all production rooms <strong>to</strong> show pressure differential,<br />
temperature and humidity, remotely displayed at the entrance<br />
<strong>to</strong> each room;<br />
■ Process and instrumentation (P&I) diagrams for the air<br />
conditioning system were provided for each room <strong>to</strong> detail<br />
stringent air flow requirements and the effects of dust extraction<br />
on the air balance quantities. P&I diagrams were also a<br />
requirement of the quality assurance system.<br />
The design for <strong>WSP</strong>’s MEP services at Aspen Pharmac<strong>are</strong><br />
won the South African Association of Consulting Engineers’<br />
annual Design Award Competition for Design Excellence<br />
43