We are pleased to present this book which showcases ... - WSP Group
We are pleased to present this book which showcases ... - WSP Group
We are pleased to present this book which showcases ... - WSP Group
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
ENVIRONMENTAL<br />
Breme Park Bromsgrove, UK<br />
INNOVATIVE REMEDIATION SOLUTION ENABLES SUCCESSFUL DEVELOPMENT<br />
OF FORMER INDUSTRIAL SITE<br />
<strong>WSP</strong>’s remediation team has designed and completed an innovative<br />
and sustainable remediation solution <strong>to</strong> enable the transformation of<br />
a former drop forging works in<strong>to</strong> a flagship residential development<br />
and technology park.The remediation has brought about the<br />
regeneration and redevelopment of a large tract of blighted land,<br />
providing much needed employment for local people in the<br />
immediate and long term.<br />
The sensitive location of the 22 ha site above a major aquifer,<br />
combined with the extensive and widespread nature of<br />
contamination from 50 years of heavy industrial activity, re<strong>present</strong>ed<br />
a significant development challenge. Contamination included<br />
saturation of soils with heavy oils, an on-site landfill containing<br />
hazardous substances, and over 20 000 sq m of land affected by neat<br />
oils floating on the groundwater table from leaking sumps, tanks and<br />
industrial operations.<br />
<strong>WSP</strong> was appointed in advance of the sale of the land <strong>to</strong> undertake<br />
a rapid programme of ground investigation <strong>to</strong> quantify liabilities<br />
associated with the proposed redevelopment and provide a<br />
guaranteed maximum price for remediation.This facilitated the<br />
purchase of the site by Persimmon Homes, who then commissioned<br />
<strong>WSP</strong>’s specialist land remediation arm <strong>to</strong> undertake the remediation<br />
of soil and groundwater under a fixed price contract.<br />
The approach was based on the on-site treatment of the majority of<br />
contamination at a fraction of the cost of traditional off-site disposal.<br />
The work was integrated with the demolition programme <strong>to</strong> reduce<br />
the time required for remediation.<br />
Human health and controlled water risk assessments were<br />
undertaken in close and extensive consultation with the regula<strong>to</strong>ry<br />
authorities, who have since used the site as an example of best<br />
practice in land remediation in their staff training sessions.<br />
Our ability <strong>to</strong> provide cost certainty at the point of acquisition and<br />
deliver the project on time and <strong>to</strong> budget has resulted in the site<br />
being one of the most successful brownfield reclamation projects<br />
within Persimmon’s portfolio and has reinforced the company’s<br />
desire <strong>to</strong> continue <strong>to</strong> develop on complex brownfield sites.<br />
Remediation work at Breme Park included:<br />
■ Management and verification of site decommissioning, asbes<strong>to</strong>s<br />
removal and demolition works;<br />
■ On-site treatment of oil hydrocarbon contaminated soils using<br />
bioremediation <strong>to</strong> reduce the concentration of <strong>to</strong>tal petroleum<br />
hydrocarbons (TPH) <strong>to</strong> agreed target criteria;<br />
■ Remediation of light non-aqueous phase liquids from a network<br />
of 350 groundwater remediation wells using <strong>WSP</strong>’s proprietary<br />
vacuum extraction techniques – over 15 000 litres of oil<br />
recovered from the groundwater;<br />
■ Disposal of untreatable PCB contaminated soils <strong>to</strong> landfill<br />
or for incineration;<br />
■ All contamination reduced <strong>to</strong> below agreed target concentrations;<br />
■ All works signed off by regula<strong>to</strong>ry authorities.<br />
Client:<br />
Persimmon Homes<br />
Project team:<br />
Architect: RPS<br />
Project value:<br />
£2.4M<br />
Project size:<br />
22 ha former drop forging works<br />
<strong>WSP</strong> services:<br />
Geo-environmental investigation<br />
Hazardous materials survey<br />
Quantitative risk assessment<br />
Remediation design<br />
Remediation of contaminated soil and groundwater<br />
Regula<strong>to</strong>ry authority sign-off<br />
83