Friday 20 July 2012 <strong>Written</strong> <strong>Answers</strong><br />

TABLE 1: NUMBER OF APPLICATIONS RECEIVED<br />

Wind Farm<br />

Single Wind<br />

Turbine Other Renewable Total<br />

2002/03 5 22 5 32<br />

2003/04 7 42 7 56<br />

2004/05 26 48 15 89<br />

2005/06 24 90 44 158<br />

2006/07 25 136 28 189<br />

2007/08 22 174 54 250<br />

2008/09 16 230 32 278<br />

2009/10 22 161 27 210<br />

2010/11 19 620 41 680<br />

2011/12 14 343 32 389<br />

Total 180 1866 285 2331<br />

Source: Planning<br />

Table 2 sets out the decisions for wind farm, single wind turbine and other renewable applications<br />

which were approved, refused or withdrawn in the last 10 years.<br />

TABLE 2: NUMBER OF DECISIONS<br />

Wind Farm Single Wind Turbine Other Renewable<br />

App Ref Wit Tot App Ref Wit Tot App Ref Wit Tot<br />

2002/03 0 0 2 2 8 0 0 8 2 0 0 2<br />

2003/04 2 0 1 3 25 0 0 25 4 0 0 4<br />

2004/05 1 0 1 2 30 1 0 31 12 0 0 12<br />

2005/06 5 0 0 5 65 2 0 67 21 0 0 21<br />

2006/07 6 0 0 6 105 6 0 111 24 0 0 24<br />

2007/08 12 1 1 14 148 7 0 155 53 0 0 53<br />

2008/09 10 1 3 14 227 14 0 241 44 0 0 44<br />

2009/10 11 7 1 19 104 19 0 123 20 0 0 20<br />

2010/11 13 0 7 20 119 26 2 147 13 0 0 13<br />

2011/12 10 2 2 14 220 62 1 283 32 0 0 32<br />

Total 70 11 18 99 1051 137 3 1191 225 0 0 225<br />

Source: Planning<br />

Table 3 sets out the percentage of applications for wind farms, single wind turbines and other<br />

renewable applications that were approved, refused or withdrawn in the last 10 years.<br />

WA 500