<strong>Final</strong> <strong>Environmental</strong> <strong>Impact</strong> <strong>Statement</strong> <strong>Rio</strong> <strong>de</strong> <strong>los</strong> <strong>Pinos</strong> <strong>Vegetation</strong> Management Project<br />

classified roads that are currently unauthorized (c<strong>los</strong>ed to public motor vehicle travel) would<br />

remain so following treatment activities, excepting the road reroute just <strong>de</strong>scribed. These roads<br />

that are used for harvest activities would receive treatments to stabilize and/or rehabilitate them<br />

through <strong>de</strong>commissioning and seeding. The necessary road work for Alternative 2 is <strong>de</strong>tailed in<br />

Table 3.15-2 below.<br />

Table 3.15-2 Road Network Nee<strong>de</strong>d For Access in Alternative 2.<br />

Length in<br />

Road Number<br />

Miles<br />

Work Required<br />

Estimated<br />

Cost<br />

Remarks<br />

118 1.8 Maintenance $2,500<br />

118.1A 1.8 None No Use / Leave C<strong>los</strong>ed<br />

118.1C 3.2<br />

Reconstruction<br />

Maintenance<br />

$15,000 Culvert Replacement<br />

118.1H 0.5 None No Use / Leave C<strong>los</strong>ed<br />

118.1J 0.4<br />

Reconstruction<br />

Maintenance<br />

$13,200 Stream Crossing Installation<br />

118.1K 0.2<br />

Reconstruction<br />

Maintenance<br />

$12,600 Stream Crossing Installation<br />

118.2 2.4<br />

Reconstruction<br />

Maintenance<br />

$18,000<br />

Culvert Replacement,<br />

Reconditioning, and<br />

Spot Gravel<br />

118.2A 0.6 None No Use / Leave C<strong>los</strong>ed<br />

118.2B 0.4 None No Use / Leave C<strong>los</strong>ed<br />

118.2C 0.1 None No Use / Leave C<strong>los</strong>ed<br />

118.2D 1.0<br />

Reconstruction<br />

Maintenance<br />

$14,000<br />

Culvert Installation and Spot<br />

Gravel<br />

118.2E 0.75<br />

Reconstruction<br />

Maintenance<br />

$2,400 Gra<strong>de</strong> Dip Installation<br />

118.2F 1.4<br />

Reconstruction<br />

Maintenance<br />

$3,400 Gra<strong>de</strong> Dip Installation<br />

118.2G 0.7<br />

Reconstruction<br />

Maintenance<br />

$6,400<br />

Culvert and Gra<strong>de</strong> Dip<br />

Installation<br />

Alternative 3 – Reduced Salvage Harvest<br />

Similar types of road work would be necessary to efficiently access timber stands to be harvested<br />

as found in Alternative 2. The number of roads and the total miles of road nee<strong>de</strong>d to implement<br />

this alternative are less, and no new temporary road construction would be required. The road<br />

work nee<strong>de</strong>d for Alternative 3 is <strong>de</strong>tailed in Table 3.15-3 below.<br />

Table 3.15-3 Road Network Nee<strong>de</strong>d For Access in Alternative 3.<br />

Length in<br />

Road Number<br />

Miles<br />

Work Required<br />

Estimated<br />

Cost<br />

Remarks<br />

118 1.8 Maintenance $2,500<br />

118.1A 1.8 None No Use / Leave C<strong>los</strong>ed<br />

118.1C 3.2<br />

Reconstruction<br />

Maintenance<br />

$15,000 Culvert Replacement<br />

118.1H 0.5 None No Use / Leave C<strong>los</strong>ed<br />

Chapter 3 – Affected Environment & <strong>Environmental</strong> Consequences Page 3-82