13.08.2013 Views

Final Environmental Impact Statement Rio de los Pinos Vegetation ...

Final Environmental Impact Statement Rio de los Pinos Vegetation ...

Final Environmental Impact Statement Rio de los Pinos Vegetation ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Final</strong> <strong>Environmental</strong> <strong>Impact</strong> <strong>Statement</strong> <strong>Rio</strong> <strong>de</strong> <strong>los</strong> <strong>Pinos</strong> <strong>Vegetation</strong> Management Project<br />

Un<strong>de</strong>r this proposal, trees 8 inches DBH and larger would be consi<strong>de</strong>red for harvest. With the<br />

exception of the patch cuts, all live non-beetle infested trees not interfering with operations<br />

would be left. Rehabilitation of areas experiencing heavy spruce mortality would occur through<br />

natural and artificial regeneration.<br />

Most of the treatment areas are accessible using the existing transportation system. Some road<br />

reconstruction, maintenance, and reopening one or more old, unclassified roads would be<br />

required. During the project, road reconstruction and/or maintenance (pre-haul, during haul,<br />

post-haul) would occur on approximately 11.9 miles of classified roads, and up to approximately<br />

3.3 miles of old roads would be temporarily re-opened, then c<strong>los</strong>ed at the end of the project.<br />

This work would be nee<strong>de</strong>d for access, improved safety, and additional resource protection.<br />

Maintenance may inclu<strong>de</strong> grading, culvert replacement, and spot gravel applications over a<br />

number of sections of road. Reconstruction may inclu<strong>de</strong> drainage installation and surface<br />

reconditioning and spot gravel applications on native-surface roads. These efforts would reduce<br />

erosion from these road sections and the resultant sedimentation. Road reconstruction and<br />

maintenance would involve work on Forest System Roads (FSR) 118, 118.1C, 118.1G, 118.1J,<br />

118.1K, 118.2, 118.2D, 118,2E, and 118.2G. Upon project completion, all classified roads that<br />

were c<strong>los</strong>ed to motor vehicle travel prior to the project would remain c<strong>los</strong>ed. Classified roads<br />

that are presently c<strong>los</strong>ed and old roads that would be reconstructed for log haul would be<br />

rehabilitated by subsoiling and seeding according to the project <strong>de</strong>sign criteria in Table 2.5-6 in<br />

or<strong>de</strong>r to reduce resource impacts and to put the road templates back into resource production.<br />

1.4 Analysis Area<br />

The Analysis Area covers approximately 1379 acres. It is located along the <strong>Rio</strong> <strong>de</strong> <strong>los</strong> <strong>Pinos</strong> on<br />

the Conejos Peak Ranger District, approximately two miles northwest of Cumbres Pass. (Figure<br />

1.4-1).<br />

The legal <strong>de</strong>scription is Township 33 North, Range 4 East, Sections 22, 23, 25-27, 34-36,<br />

NMPM.<br />

Figure 1.4-1 shows the Analysis Area and vicinity in context to local communities and features.<br />

Chapter 1 – Purpose & Need Page 1-3