Objective ALLO1<br />

Maintain or restore lynx habitat connectivity in and between LAU’s and in linkage<br />

areas.<br />

• Connectivity will be maintained within the project area and LAU through unharvested<br />

WIZ areas dispersed throughout the Analysis Area, in addition to trees left standing<br />

(which inclu<strong>de</strong> un<strong>de</strong>rstory vegetation, fir trees of all sizes, and snags left standing (38-60<br />

trees per acre).<br />

Standard VEG S1<br />

If more than 30 percent of the lynx habitat in an LAU is currently in a stand<br />

initiation structural stage that does not yet provi<strong>de</strong> winter snowshoe hare habitat,<br />

no additional habitat may be regenerated by vegetation management projects.<br />

• All treatments are consistent with VEGS1. Un<strong>de</strong>r current conditions, only 2% of the<br />

Rito-Archuleta LAU is in a stand initiation structural stage (SISS). Treatment un<strong>de</strong>r<br />

either of the action alternatives would not result in an increase in the percent of habitat in<br />

a SISS.<br />

Standard VEG S2<br />

Timber management projects shall not regenerate more than 15 percent of lynx<br />

habitat on NFS lands within an LAU in a ten-year period. This 15 percent inclu<strong>de</strong>s<br />

the entire stand within an even-aged regeneration area, and only the patch opening<br />

areas within group selections. Salvage harvest within stands killed by insect<br />

epi<strong>de</strong>mics, wildfire, etc. does not add to the 15 percent, unless the harvest treatment<br />

would cause the lynx habitat to change to an unsuitable condition.<br />

• Implementation of this project would be expected to change a very small amount (28 -29<br />

acres) of lynx habitat into a currently unsuitable (SISS) condition. This does not change<br />

the percent (currently 2%) of unsuitable lynx habitat within the Rito-Archuleta LAU.<br />

Therefore, this project easily meets the standard.<br />

Standard VEG S6<br />

<strong>Vegetation</strong> management projects that reduce winter snowshoe hare habitat in multistory<br />

mature or late successional conifer forests may occur only (VEG S6<br />

Exceptions):<br />

1. Within 200 feet of administrative sites, dwellings, outbuildings, recreation sites,<br />

and special use permit improvements, including infrastructure within permitted<br />

ski area boundaries;<br />

Chapter 3 – Affected Environment & <strong>Environmental</strong> Consequences Page 3-40