20.08.2013 Views

tender no: hpc/nz/bahadurgarh/bulk/pol/2012-13/1 technical bid

tender no: hpc/nz/bahadurgarh/bulk/pol/2012-13/1 technical bid

tender no: hpc/nz/bahadurgarh/bulk/pol/2012-13/1 technical bid

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Tender No. Hindustan Petroleum Corporation Limited Page 83 of 94<br />

Tender for Road Transportation of Bulk POL products: MS<br />

/HSD and Branded fuels<br />

including retrospectively, which would be binding on the Carrier. Difference in<br />

transportation charges arising out of this revision will be recoverable / payable from the<br />

date of Agreement or effective date of such revision, whichever is later.<br />

While reviewing the RTKMs from time to time , HPC may determine RTKM of retail outlets<br />

by using a suitable IT tool, based on Google Maps application. The RTKM so determined<br />

shall be binding on the transport contractors.<br />

(d) Company reserves the right to use the Tank Trucks on their return trip based on<br />

Company's own operational convenience / requirement for delivery of petroleum products.<br />

Payment in such case would be made only to the extent of any additional distance covered<br />

beyond the <strong>no</strong>rmal RTKM route for which the movement was undertaken.<br />

(e) The procedure for payment of transport bills and reimbursement of entry / transit / bridge /<br />

toll tax / octroi charges prevalent in the Company from time to time would be binding on the<br />

Carrier.<br />

(f) The Company has <strong>no</strong>t guaranteed any minimum billings / mileage or loads for any period<br />

whatsoever. Hence, Company will <strong>no</strong>t be responsible for their inability in offering any load<br />

on any day or during any particular period and <strong>no</strong> idle charges etc. would be payable.<br />

(g) The Company will endeavor to arrange unloading of the Tank Trucks within reasonable<br />

time. However, <strong>no</strong> detention charges etc. are payable if, for any reason, such unloading is<br />

delayed at the receiving location.<br />

7.<br />

(a) The Carrier shall deposit a sum of Rs. _______ as Security Deposit for due fulfillment of<br />

terms of this Agreement. This sum shall <strong>no</strong>t bear any interest.<br />

(b) Company shall be entitled to adjust any sum due to it from the Security Deposit amount<br />

and / or any transport / other charges / dues pending for payment to the Carrier against any<br />

other contract. The decision of the Company will be final and binding on the Carrier.<br />

8.<br />

i. The Carriers will be responsible for loading and discharging of the Tank Trucks. All the<br />

instructions of the Company with regard to the same would be binding on the Carrier.<br />

ii. Only the Crew of the Tank Truck and authorized representative of the Carrier shall be<br />

allowed entry inside the Company’s loading / unloading locations.<br />

iii. The following precautions shall be taken while loading / unloading tanks trucks:<br />

a. TT engine to be switched off<br />

b. Master Electrical Switch is switched off<br />

c. Hand brake to be applied and Gear put in neutral<br />

d. Fire extinguisher to be placed in the marked area in front of the TT.<br />

e. Wooden Wheel Chocks are applied to the wheels as per prescribed procedure<br />

f. PPE ( personal protective equipment) including the Safety harness belt is worn.<br />

g. Earthing and bonding connections between the TT and the earth pits is made as<br />

per prescribed procedure<br />

h. Delivery valves are closed and Master valves are opened<br />

i. Appropriate loading arms are into the compartments<br />

j. All further instructions for loading under manual or Automation as the case may<br />

be, shall be followed diligently<br />

k. TT crew shall be present during the entire operation of filling.<br />

l. After loading operation, the loading arm shall be properly placed in the position<br />

provided so that there is <strong>no</strong> spillage in the gantry; wooden chokes are removed<br />

from the wheels, earthing & bonding wires are disconnected, fire extinguisher is<br />

returned to the tank truck and the tank truck is safely driven out of the gantry.<br />

9.<br />

(a) The Carrier shall be responsible for quantity and quality of the products received by him for<br />

83<br />

Seal Signature of Tenderer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!