20.08.2013 Views

tender no: hpc/nz/bahadurgarh/bulk/pol/2012-13/1 technical bid

tender no: hpc/nz/bahadurgarh/bulk/pol/2012-13/1 technical bid

tender no: hpc/nz/bahadurgarh/bulk/pol/2012-13/1 technical bid

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Tender No. Hindustan Petroleum Corporation Limited Page 9 of 94<br />

Tender for Road Transportation of Bulk POL products: MS<br />

/HSD and Branded fuels<br />

7. Replacement of T/T :<br />

Replacement of T/T may be considered, provided the TT meets the following Requirement:<br />

a) The age of the newly offered T/T is lesser than the age of the existing T/T by at least<br />

two years.<br />

b) The capacity of the newly offered TT is higher than or equal to the capacity of the TT<br />

to be replaced.<br />

c) In case the <strong>tender</strong>er has <strong>no</strong>t quoted in the <strong>tender</strong> for higher capacity tank trucks,<br />

applicable rates at the location for higher capacity or the rates quoted by the <strong>tender</strong>er in<br />

less than 18 KL capacity, whichever is lower, shall be paid for such tank trucks inducted<br />

against replacement.<br />

d) However, replacement of the existing TT, as above, shall strictly be subject to<br />

the business Requirement of the Location, and the decision of the corporation is final<br />

8. Fleet Card:<br />

Successful <strong>bid</strong>der shall be made member of HPCL loyalty card (Drive Track Fleet card)<br />

and 25% of the total PCB payment due, shall be paid through HPCL<br />

loyalty card (Drive Track Fleet card).<br />

9. Transporter shall comply with the following requirements:<br />

(a) Security locking system :<br />

The tank trucks are provided with the security locks in the delivery valves as well as in the top<br />

dome covers. The security locks have the unique feature of master key maintained with the supply<br />

locations and dealer specific keys at the receiving end. Scope of inspection is to ensure that the<br />

security locking system is <strong>no</strong>t tampered with and all the empty and loaded trucks reach / leave the<br />

premises with the locking system intact in the tank lorry as per the Security Locking Manual.<br />

(b) Delivery Valves :<br />

Each of the compartments is provided with a set of delivery valves. In both empty and loaded<br />

condition the valves are tightened to the maximum and the stem wheel is locked with security<br />

locks (either Abloy or Godrej make). A brass strip with Y rod welded on it, is provided for<br />

connecting all the stem wheels, and locked with security locks with each of the stem wheel, to<br />

prevent any rotational movement of the wheels (and there by the valves) when the valves are<br />

locked. The joining surface of valve stem and wheel are perfectly welded / brazed, to avoid any<br />

upward/ downward movement between stem and wheel. In addition, Y rods are provided to further<br />

eliminate any chance of wheel movement. Security locks provided on each of the individual valves<br />

along with the Y rod are removed at the time of unloading the product. After unloading the product,<br />

all the valves are tightened to the maximum and the security locking along with the Y rod is put<br />

back by the retailoutlets / customers. Tank truck shall come back to the Depot / Terminal with the<br />

security locking system in position. In addition to the locking of the individual delivery valves, all<br />

the valves have been enclosed in a valve box.<br />

It needs to be ensured that the stem of the valve wheel has <strong>no</strong>t been tampered with and that after<br />

locking of the stem wheel, there can<strong>no</strong>t be any movement of the wheel so that product unloading<br />

is <strong>no</strong>t possible.<br />

Inspection of security locking would cover the following:<br />

• Security locking system tampering<br />

• All the empty and loaded trucks reach / leave the premises with the locking system intact<br />

• Proper brazing / welding<br />

• Y rod/ brass strip firmly placed<br />

• Play of the valve wheel<br />

Seal Signature of Tenderer<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!