Council Minutes 21 January 2008 - Waratah-Wynyard Council
Council Minutes 21 January 2008 - Waratah-Wynyard Council
Council Minutes 21 January 2008 - Waratah-Wynyard Council
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Planning Authority Reports<br />
Relevant Standards for use or development in the Residential Zone<br />
6.4.1 Issue 1.0: - Effluent and stormwater disposal<br />
Objective: To ensure that effluent and stormwater discharge from new<br />
development does not have an adverse effect on water quality.<br />
Acceptable Solution<br />
Performance Criteria<br />
Serviced Areas<br />
1.1 Effluent is to be disposed of by a<br />
connection to reticulated<br />
sewerage, sewage treatment<br />
and stormwater systems.<br />
1.3 The cost of the chosen system or<br />
connection to existing<br />
infrastructure is to be at the<br />
developers expense.<br />
Serviced Areas<br />
1.1 No performance criteria<br />
1.3 No performance criteria<br />
A condition of permit will require the developer to connect each lot to the<br />
reticulated sewerage and stormwater systems and the developer will also be<br />
obliged to meet all costs associated with the necessary connections.<br />
The proposal meets the Acceptable Solution.<br />
6.4.1 Issue 3.0:- Subdivision<br />
Objective: To ensure that land is subdivided in a manner:<br />
a. which is appropriate to the intended use or development;<br />
b. that provides appropriate infrastructure;<br />
c. that meets relevant Scheme standards;<br />
d. that provides a range and mix of lot sizes to suit a variety of dwelling<br />
and household types, with areas and dimensions that meet user<br />
requirements;<br />
e. that protects residential amenity; and<br />
f. that allows application of energy conservation principles.<br />
The proposed subdivision meets the objectives of subdivision in the<br />
Residential Zone.<br />
Acceptable Solution<br />
3.1 Lot layout shall comply with the<br />
acceptable solutions as set out in<br />
clauses 1.1, 1.2, 1,3 and 1.4 of<br />
Table 11.1 (Part 11) – Residential<br />
Development Schedule.<br />
Performance Criteria<br />
3.1 Lot layout shall comply with the<br />
performance criteria as set out in<br />
clauses 1.1, 1.2, 1,3 and 1.4 of<br />
Table 11.1 (Part 11) – Residential<br />
Development Schedule.<br />
<strong>Waratah</strong>-<strong>Wynyard</strong> <strong>Council</strong> – Ordinary Meeting <strong>Minutes</strong> – <strong>21</strong> <strong>January</strong> <strong>2008</strong> Page 27