Council Minutes 21 January 2008 - Waratah-Wynyard Council
Council Minutes 21 January 2008 - Waratah-Wynyard Council
Council Minutes 21 January 2008 - Waratah-Wynyard Council
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Planning Authority Reports<br />
Acceptable Solution<br />
Slopes<br />
1.1 Building, private roads and<br />
associated works are to be on<br />
slopes of less than 6 degrees<br />
(1:10)<br />
Performance Criteria<br />
Slopes<br />
1.1 Building, private roads and<br />
associated works may occur on<br />
slopes >1:10 provided it can be<br />
demonstrated that:<br />
(a) stormwater is managed to<br />
ensure maximum on site<br />
absorption and retention.<br />
Water movement downslope<br />
from the building or<br />
structure shall not be greater<br />
than existing before<br />
development. Roads shall<br />
follow contours and manage<br />
runoff to prevent erosion;<br />
(b) buildings shall utilise<br />
techniques which minimise<br />
the need for excavation or<br />
fill for foundations and<br />
associated hardstand areas;<br />
(c) the footprint of buildings or<br />
structures shall be minimized<br />
and the building mass<br />
stepped down the slope; and<br />
(d) septic absorption efficiency is<br />
not reduced.<br />
The majority of the lots are on a slope of less than 6 degrees. The land in the<br />
south-eastern corner of the lot slopes towards a low point (wetland area). The<br />
slope of the land is 1:4 and impacts on part of Lot 11, and to a lesser degree,<br />
Lots 12 and 13. The only works that will occur within this steeper land as part<br />
of the subdivision works will be the internal road for Lot 11. It is understood<br />
that the full extent of this road will not be constructed until approval is granted<br />
for future multi-unit development. The lots each contain areas of land which<br />
are suitable for construction of dwellings. All lots can be connected to full<br />
reticulated services and appropriately drained.<br />
The proposal meets the Performance Criteria.<br />
<strong>Waratah</strong>-<strong>Wynyard</strong> <strong>Council</strong> – Ordinary Meeting <strong>Minutes</strong> – <strong>21</strong> <strong>January</strong> <strong>2008</strong> Page 56