02.02.2014 Views

Council Minutes 21 January 2008 - Waratah-Wynyard Council

Council Minutes 21 January 2008 - Waratah-Wynyard Council

Council Minutes 21 January 2008 - Waratah-Wynyard Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Planning Authority Reports<br />

Orientation and Energy<br />

3.7 A minimum of 70% of all lots are<br />

to be orientated to facilitate the<br />

siting of houses to take advantage<br />

of solar access by ensuring that<br />

houses can be built on the lot(s)<br />

in which the living room will<br />

receive not less than 4 hours of<br />

sunshine between 9am and 3pm<br />

on June <strong>21</strong>.<br />

3.8 Any new lot in an established<br />

residential area is to have no<br />

more than one third of its area<br />

covered by the shadow of existing<br />

development on June <strong>21</strong> between<br />

the hours of 10:00 am to 2:00 pm.<br />

3.7 Lots are to be orientated to<br />

facilitate the siting of dwellings to<br />

take advantage of microclimatic<br />

benefits, and have dimensions to<br />

allow adequate on site solar<br />

access, taking into account likely<br />

dwelling size and the relationship<br />

of each lot to the street.<br />

3.8 The dimensions of any lot are to<br />

allow solar access on site to be<br />

maximized, taking into account<br />

the likely house size and the<br />

relationship of each lot to existing<br />

buildings or adjoining land.<br />

In the absence of building envelopes indicating how dwellings might be sited<br />

to provide advantage of solar access, it is considered difficult to ascertain<br />

compliance with Acceptable Solution 3.7 with any certainty. This is<br />

compounded by the fact that the lots fronting York Street are sited on the<br />

north-south axis with the likelihood that open spaces and living areas would<br />

face a southerly direction. Therefore, reliance on the Performance Criteria is<br />

required in this instance. The size of the proposed lots at a minimum of 702m 2<br />

will allow for future development to be sited to enable adequate solar access.<br />

Lots 5-12 will provide some greater difficulty for future dwelling design but<br />

compliance with the Performance Criteria is considered to have been achieved.<br />

The location of the subdivision is such that only one lot may potentially be<br />

impacted upon by neighbouring residential development, being 145 Inglis<br />

Street which is adjacent to Lot 1. The orientation of Lot 1 is such that it will<br />

not be impacted upon by overshadowing from the adjacent Lot.<br />

6.4.1 Issue 6.0: - Infrastructure Provision<br />

Objective: To ensure that the cost of providing infrastructure to new<br />

development is not borne by the community.<br />

Acceptable Solution<br />

6.1 Where a use or development<br />

requires the provision of<br />

infrastructure or will exceed the<br />

design capacity of existing public<br />

infrastructure, the cost of the<br />

infrastructure is to be paid for by<br />

the person undertaking the use or<br />

development.<br />

Performance Criteria<br />

6.1 Where a use or development<br />

requires the provision of<br />

infrastructure or will exceed the<br />

design capacity of existing public<br />

infrastructure, the applicant shall<br />

demonstrate that an agreement<br />

has been entered into with<br />

relevant body to pay for such<br />

infrastructure as part of the<br />

approval.<br />

<strong>Waratah</strong>-<strong>Wynyard</strong> <strong>Council</strong> – Ordinary Meeting <strong>Minutes</strong> – <strong>21</strong> <strong>January</strong> <strong>2008</strong> Page 30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!