Planning Authority Reports<br />
5. All work carried out in the construction of the civil works<br />
associated with the development are to comply with the<br />
requirements of <strong>Council</strong>’s policy – Standard requirements for<br />
the construction of new infrastructure assets and the<br />
replacement of existing infrastructure assets.<br />
6. The construction works are to be carried out in accordance<br />
with plans, specifications, calculations and computations<br />
approved by the Director Engineering Services and prepared<br />
by, or certified by, a Chartered Professional Engineer. The<br />
works are to be supervised by the Engineer who is to certify, by<br />
issue of a certificate, that the works have been substantially<br />
completed in accordance with the approved plans and<br />
specifications and submit ‘Work as Executed’ drawings of the<br />
completed works in both paper and electronic format.<br />
7. No damage is to be caused to the road, footpath or other<br />
facility.<br />
8. No material is to be deposited onto the road.<br />
9. No materials, machinery or operational construction is to be<br />
located on the road, footpath, and nature strip or road<br />
reservation.<br />
10. Necessary easements for powerlines, sewerage, water,<br />
drainage, access and the like are to be depicted in the final<br />
survey plan lodged for sealing.<br />
11. A six (6) month maintenance period is to apply to all works<br />
within the development for which <strong>Council</strong> will assume future<br />
responsibility. A maintenance bond of 5% of the cost of the<br />
civil works is to be lodged with <strong>Council</strong> prior to the sealing of<br />
the Final Survey Plan. Commencement of the maintenance<br />
period is to be at the sealing of the Final Survey Plan.<br />
12. During the construction phase, all works are to be carried out<br />
between the following hours:<br />
Monday to Friday – 7:00 a.m. to 6:00 p.m. inclusive<br />
Saturday – 8:00 a.m. to 6:00 p.m. inclusive<br />
Sundays and Public Holidays – 10:00 a.m. to 6:00 p.m.<br />
inclusive<br />
<strong>Waratah</strong>-<strong>Wynyard</strong> <strong>Council</strong> – Ordinary Meeting <strong>Minutes</strong> – <strong>21</strong> <strong>January</strong> <strong>2008</strong> Page 41