Planning Authority Reports<br />

5. All work carried out in the construction of the civil works<br />

associated with the development are to comply with the<br />

requirements of <strong>Council</strong>’s policy – Standard requirements for<br />

the construction of new infrastructure assets and the<br />

replacement of existing infrastructure assets.<br />

6. The construction works are to be carried out in accordance<br />

with plans, specifications, calculations and computations<br />

approved by the Director Engineering Services and prepared<br />

by, or certified by, a Chartered Professional Engineer. The<br />

works are to be supervised by the Engineer who is to certify, by<br />

issue of a certificate, that the works have been substantially<br />

completed in accordance with the approved plans and<br />

specifications and submit ‘Work as Executed’ drawings of the<br />

completed works in both paper and electronic format.<br />

7. No damage is to be caused to the road, footpath or other<br />

facility.<br />

8. No material is to be deposited onto the road.<br />

9. No materials, machinery or operational construction is to be<br />

located on the road, footpath, and nature strip or road<br />

reservation.<br />

10. Necessary easements for powerlines, sewerage, water,<br />

drainage, access and the like are to be depicted in the final<br />

survey plan lodged for sealing.<br />

11. A six (6) month maintenance period is to apply to all works<br />

within the development for which <strong>Council</strong> will assume future<br />

responsibility. A maintenance bond of 5% of the cost of the<br />

civil works is to be lodged with <strong>Council</strong> prior to the sealing of<br />

the Final Survey Plan. Commencement of the maintenance<br />

period is to be at the sealing of the Final Survey Plan.<br />

12. During the construction phase, all works are to be carried out<br />

between the following hours:<br />

Monday to Friday – 7:00 a.m. to 6:00 p.m. inclusive<br />

Saturday – 8:00 a.m. to 6:00 p.m. inclusive<br />

Sundays and Public Holidays – 10:00 a.m. to 6:00 p.m.<br />

inclusive<br />