Planning Authority Reports<br />
13. A new kerb crossover to each lot is to be constructed in<br />
accordance with Municipal Standard Drawing No SD1003<br />
Urban Roads – Standard Vehicle Crossing to the satisfaction of<br />
the Director Engineering Services.<br />
14. A reinforced concrete driveway between the kerb crossover and<br />
the property boundary of each lot is to be constructed in<br />
accordance with Municipal Standard Drawing SD1003 Urban<br />
Roads – Standard Vehicle Crossing.<br />
15 A reticulated stormwater drainage system is to be provided<br />
with individual lot connections, road drainage and method of<br />
discharge in accordance with the requirements of the Director<br />
Engineering Services. The return interval for the reticulation<br />
network is 1 in 5 year ARI.<br />
16. An environmental management plan is to be prepared and<br />
submitted for the approval of the Director Engineering<br />
Services, prior to disturbance or construction, outlining<br />
proposed practices in relation to:<br />
i Temporary run-off and erosion controls are to be<br />
installed before the development commences. Controls<br />
are to include, but are not limited to:<br />
• Minimise site disturbance and vegetation<br />
removal;<br />
• Diversion of up-slope run-off around cleared<br />
and/or disturbed areas, areas to be cleared<br />
and/or disturbed or filling provided that such<br />
diverted water will not cause erosion and is<br />
directed to a legal discharge point;<br />
• Installation of sediment retention traps (e.g.<br />
sediment fences, etc.) at the down slope perimeter<br />
of the disturbed area or stockpile to prevent<br />
unwanted sediment and other debris escaping<br />
from the land;<br />
• Rehabilitation of all disturbed areas as soon as<br />
possible.<br />
ii Weed management.<br />
iii Storage facilities for fuels, oils, greases, chemicals and<br />
the like.<br />
iv Litter management.<br />
17. The provision of an 18 metre wide road reservation, with lot<br />
boundaries splayed where necessary and shown as Road on the<br />
final survey plan lodged for sealing.<br />