Council Minutes 21 January 2008 - Waratah-Wynyard Council
Council Minutes 21 January 2008 - Waratah-Wynyard Council
Council Minutes 21 January 2008 - Waratah-Wynyard Council
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Planning Authority Reports<br />
24. The intersection of Hill and Inglis Streets is to have traffic<br />
channelisation which prevents a right-hand turn from Hill<br />
Street into Inglis Street. The intersection treatment is at the<br />
cost of the developer and is to be carried out to the satisfaction<br />
of the Director Engineering Services.<br />
25. The developer is to supply and install street and traffic control<br />
signage required for the development. The signage is to<br />
comply with the requirements of the suite of AS 1742 standards.<br />
26. Footpaths are to be constructed in accordance with <strong>Council</strong>’s<br />
Standard Drawing SD1006 and located as per the endorsed<br />
plan for the internal road network.<br />
27. The provision of a reticulated water supply to the development<br />
with individual lot connections and fire plugs in accordance<br />
with <strong>Council</strong>’s specifications (min. pipe size 100mm) and the<br />
requirements of the Tasmanian Fire Service. The developer is<br />
to supply and install water meters to all allotments. Water<br />
meter type is to be approved by the Director Engineering<br />
Services.<br />
28. Water meters are to be located so as to afford unobstructed<br />
access to service personnel.<br />
29. The provision of a reticulated sewerage system to the<br />
development with individual lot connections and method of<br />
disposal in accordance with the requirements of the Director<br />
Engineering Services. The system to be designed by a<br />
Chartered Professional Engineer.<br />
30. Street lighting is to be provided in accordance with the<br />
requirements of Aurora Energy Pty Ltd and the Director<br />
Engineering Services. The street lighting is to be designed to<br />
minimise off site glare and reflected light. The use of nonstandard<br />
lighting poles is not permitted within the development.<br />
31. Underground power is to be provided to the development in<br />
accordance with the requirements of Aurora Energy Pty Ltd<br />
and <strong>Council</strong>’s standard drawings and specifications.<br />
32. Telecommunications infrastructure is to be provided to the<br />
development in accordance with the requirements of Telstra<br />
and <strong>Council</strong>’s standard drawings and specifications.<br />
<strong>Waratah</strong>-<strong>Wynyard</strong> <strong>Council</strong> – Ordinary Meeting <strong>Minutes</strong> – <strong>21</strong> <strong>January</strong> <strong>2008</strong> Page 44