02.02.2014 Views

Council Minutes 21 January 2008 - Waratah-Wynyard Council

Council Minutes 21 January 2008 - Waratah-Wynyard Council

Council Minutes 21 January 2008 - Waratah-Wynyard Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Planning Authority Reports<br />

24. The intersection of Hill and Inglis Streets is to have traffic<br />

channelisation which prevents a right-hand turn from Hill<br />

Street into Inglis Street. The intersection treatment is at the<br />

cost of the developer and is to be carried out to the satisfaction<br />

of the Director Engineering Services.<br />

25. The developer is to supply and install street and traffic control<br />

signage required for the development. The signage is to<br />

comply with the requirements of the suite of AS 1742 standards.<br />

26. Footpaths are to be constructed in accordance with <strong>Council</strong>’s<br />

Standard Drawing SD1006 and located as per the endorsed<br />

plan for the internal road network.<br />

27. The provision of a reticulated water supply to the development<br />

with individual lot connections and fire plugs in accordance<br />

with <strong>Council</strong>’s specifications (min. pipe size 100mm) and the<br />

requirements of the Tasmanian Fire Service. The developer is<br />

to supply and install water meters to all allotments. Water<br />

meter type is to be approved by the Director Engineering<br />

Services.<br />

28. Water meters are to be located so as to afford unobstructed<br />

access to service personnel.<br />

29. The provision of a reticulated sewerage system to the<br />

development with individual lot connections and method of<br />

disposal in accordance with the requirements of the Director<br />

Engineering Services. The system to be designed by a<br />

Chartered Professional Engineer.<br />

30. Street lighting is to be provided in accordance with the<br />

requirements of Aurora Energy Pty Ltd and the Director<br />

Engineering Services. The street lighting is to be designed to<br />

minimise off site glare and reflected light. The use of nonstandard<br />

lighting poles is not permitted within the development.<br />

31. Underground power is to be provided to the development in<br />

accordance with the requirements of Aurora Energy Pty Ltd<br />

and <strong>Council</strong>’s standard drawings and specifications.<br />

32. Telecommunications infrastructure is to be provided to the<br />

development in accordance with the requirements of Telstra<br />

and <strong>Council</strong>’s standard drawings and specifications.<br />

<strong>Waratah</strong>-<strong>Wynyard</strong> <strong>Council</strong> – Ordinary Meeting <strong>Minutes</strong> – <strong>21</strong> <strong>January</strong> <strong>2008</strong> Page 44

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!