Planning Authority Reports<br />
9. The construction works are to be carried out in accordance with plans,<br />
specifications, calculations and computations approved by the<br />
Director Engineering Services and prepared by, or certified by, a<br />
Chartered Professional Engineer. The works are to be supervised by<br />
the Engineer who is to certify, by issue of a certificate, that the works<br />
have been substantially completed in accordance with the approved<br />
plans and specifications and submit “Work as Executed” drawings of<br />
the completed works in both paper and electronic format.<br />
10. A six (6) month maintenance period is to apply to all works within the<br />
development for which <strong>Council</strong> will assume future responsibility. A<br />
maintenance bond of 5% of the cost of the civil works is to be lodged<br />
with <strong>Council</strong> prior to the sealing of the Final Survey Plan.<br />
Commencement of the maintenance period is to be at the sealing of the<br />
Final Survey Plan.<br />
11. During the construction phase, all works are to be carried out between<br />
the following hours:<br />
Monday to Friday – 7:00 a.m. to 6:00 p.m. inclusive<br />
Saturday – 8:00 a.m. to 6:00 p.m. inclusive<br />
Sundays and Public Holidays – 10:00 a.m. to 6:00 p.m. inclusive<br />
12. A new kerb crossover to each lot is to be constructed in accordance<br />
with Municipal Standard Drawing No SD1003 Urban Roads –<br />
Standard Vehicle Crossing to the satisfaction of the Director<br />
Engineering Services.<br />
13. A reinforced concrete driveway between the kerb crossover and the<br />
property boundary of each lot is to be constructed in accordance with<br />
Municipal Standard Drawing SD1003 Urban Roads – Standard<br />
Vehicle Crossing to the satisfaction of the Director engineering<br />
Services.<br />
14. A reticulated stormwater drainage system is to be provided with<br />
individual lot connections, road drainage and method of discharge in<br />
accordance with the requirements of the Director Engineering<br />
Services. The return interval for the reticulation network is 1 in 5 year<br />
ARI.<br />
15. An environmental management plan is to be prepared and submitted<br />
for the approval of the Director Engineering Services, prior to<br />
disturbance or construction, outlining proposed practices in relation<br />
to:<br />
<strong>Waratah</strong>-<strong>Wynyard</strong> <strong>Council</strong> – Ordinary Meeting <strong>Minutes</strong> – <strong>21</strong> <strong>January</strong> <strong>2008</strong> Page 35