Planning Authority Reports<br />
18. The provision of an 18 metre wide road reservation, suitably<br />
widened to 25 metres to accommodate a vehicular turning<br />
area, with lot boundaries splayed where necessary and shown<br />
as road on the final plan lodged for sealing. Alternative<br />
termination treatments will be considered.<br />
19. The construction of an asphalt sealed, compacted crushed rock<br />
pavement, designed in accordance with Austroads pavement<br />
design guidelines, with a minimum pavement thickness of 250<br />
mm plus a 30 mm asphalt seal, incorporating concrete kerb and<br />
channelling and footpaths, all to the satisfaction of the Director<br />
Engineering Services and in accordance with Standard<br />
Drawing SD1001.<br />
20. Pavement widths of the internal road to be provided are: 8.0<br />
metres measured lip of kerb to lip of kerb and 6.0 metres<br />
surface measured lip of kerb to lip of kerb for the courts.<br />
<strong>21</strong>. The road intersections, both internally, and with the <strong>Council</strong><br />
road network, are to be assessed in regard to the various<br />
requirements of the Austroads publication “Guide to traffic<br />
engineering practice – part 5 Intersections at grade.<br />
Deficiencies and traffic management issues identified are to be<br />
addressed as part of the road design process.<br />
22. York Street is to be constructed and sealed from the north<br />
western interface with the sealed section of York Street to a<br />
point 10 metres past the entry road in to the subdivision. The<br />
road pavement is to be designed in accordance with the<br />
Austroads pavement design guidelines and shall have an<br />
asphalt surface of not less than 30mm compacted depth of<br />
asphalt. The width of the road shall be 8.0 metres measured lip<br />
of kerb to lip of kerb. Kerb and channelling is to be<br />
constructed along the western side of York Street, from the<br />
internal access road to the northern boundary.<br />
23. Hill Street is to be constructed and sealed from the internal<br />
access road to Inglis Street. The road pavement is to be<br />
designed in accordance with the Austroads pavement design<br />
guidelines and shall have an asphalt surface of not less than<br />
30mm compacted depth of asphalt. The width of the road shall<br />
be 8.0 metres measured lip of kerb to lip of kerb. Kerb and<br />
channelling is to be constructed along the northern side of Hill<br />
Street, from the internal access road to the eastern boundary<br />
with Inglis Street.<br />
<strong>Waratah</strong>-<strong>Wynyard</strong> <strong>Council</strong> – Ordinary Meeting <strong>Minutes</strong> – <strong>21</strong> <strong>January</strong> <strong>2008</strong> Page 43