02.02.2014 Views

Council Minutes 21 January 2008 - Waratah-Wynyard Council

Council Minutes 21 January 2008 - Waratah-Wynyard Council

Council Minutes 21 January 2008 - Waratah-Wynyard Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Planning Authority Reports<br />

6. The construction works are to be carried out in accordance with plans,<br />

specifications, calculations and computations approved by the<br />

Director Engineering Services and prepared by, or certified by, a<br />

Chartered Professional Engineer. The works are to be supervised by<br />

the Engineer who is to certify, by issue of a certificate, that the works<br />

have been substantially completed in accordance with the approved<br />

plans and specifications and submit ‘Work as Executed’ drawings of<br />

the completed works in both paper and electronic format.<br />

7. No damage is to be caused to the road, footpath or other facility.<br />

8. No material is to be deposited onto the road.<br />

9. No materials, machinery or operational construction is to be located<br />

on the road, footpath, and nature strip or road reservation.<br />

10. Necessary easements for powerlines, sewerage, water, drainage,<br />

access and the like are to be depicted in the final survey plan lodged<br />

for sealing.<br />

11. A six (6) month maintenance period is to apply to all works within the<br />

development for which <strong>Council</strong> will assume future responsibility. A<br />

maintenance bond of 5% of the cost of the civil works is to be lodged<br />

with <strong>Council</strong> prior to the sealing of the Final Survey Plan.<br />

Commencement of the maintenance period is to be at the sealing of the<br />

Final Survey Plan.<br />

12. During the construction phase, all works are to be carried out between<br />

the following hours:<br />

Monday to Friday – 7:00 a.m. to 6:00 p.m. inclusive<br />

Saturday – 8:00 a.m. to 6:00 p.m. inclusive<br />

Sundays and Public Holidays – 10:00 a.m. to 6:00 p.m. inclusive<br />

13. A new kerb crossover to each lot is to be constructed in accordance<br />

with Municipal Standard Drawing No SD1003 Urban Roads –<br />

Standard Vehicle Crossing to the satisfaction of the Director<br />

Engineering Services.<br />

14. A reinforced concrete driveway between the kerb crossover and the<br />

property boundary of each lot is to be constructed in accordance with<br />

Municipal Standard Drawing SD1003 Urban Roads – Standard<br />

Vehicle Crossing.<br />

<strong>Waratah</strong>-<strong>Wynyard</strong> <strong>Council</strong> – Ordinary Meeting <strong>Minutes</strong> – <strong>21</strong> <strong>January</strong> <strong>2008</strong> Page 61

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!