Planning Authority Reports<br />
6. The construction works are to be carried out in accordance with plans,<br />
specifications, calculations and computations approved by the<br />
Director Engineering Services and prepared by, or certified by, a<br />
Chartered Professional Engineer. The works are to be supervised by<br />
the Engineer who is to certify, by issue of a certificate, that the works<br />
have been substantially completed in accordance with the approved<br />
plans and specifications and submit ‘Work as Executed’ drawings of<br />
the completed works in both paper and electronic format.<br />
7. No damage is to be caused to the road, footpath or other facility.<br />
8. No material is to be deposited onto the road.<br />
9. No materials, machinery or operational construction is to be located<br />
on the road, footpath, and nature strip or road reservation.<br />
10. Necessary easements for powerlines, sewerage, water, drainage,<br />
access and the like are to be depicted in the final survey plan lodged<br />
for sealing.<br />
11. A six (6) month maintenance period is to apply to all works within the<br />
development for which <strong>Council</strong> will assume future responsibility. A<br />
maintenance bond of 5% of the cost of the civil works is to be lodged<br />
with <strong>Council</strong> prior to the sealing of the Final Survey Plan.<br />
Commencement of the maintenance period is to be at the sealing of the<br />
Final Survey Plan.<br />
12. During the construction phase, all works are to be carried out between<br />
the following hours:<br />
Monday to Friday – 7:00 a.m. to 6:00 p.m. inclusive<br />
Saturday – 8:00 a.m. to 6:00 p.m. inclusive<br />
Sundays and Public Holidays – 10:00 a.m. to 6:00 p.m. inclusive<br />
13. A new kerb crossover to each lot is to be constructed in accordance<br />
with Municipal Standard Drawing No SD1003 Urban Roads –<br />
Standard Vehicle Crossing to the satisfaction of the Director<br />
Engineering Services.<br />
14. A reinforced concrete driveway between the kerb crossover and the<br />
property boundary of each lot is to be constructed in accordance with<br />
Municipal Standard Drawing SD1003 Urban Roads – Standard<br />
Vehicle Crossing.<br />