Planning Authority Reports<br />

<strong>21</strong>. Footpaths are to be constructed in accordance with <strong>Council</strong>’s standard<br />

drawing SD1006 and located on one side of the internal road network.<br />

22. A court bowl radius of 8.5 m is to be provided at the termination of the<br />

subdivisional road to facilitate the turn movements of vehicles<br />

including service vehicles such as garbage trucks. The standard of<br />

construction shall be equal to a road being constructed.<br />

23. The provision of a reticulated water supply to the development with<br />

individual lot connections and fire plugs in accordance with <strong>Council</strong>’s<br />

specifications (min. pipe size 100mm) and the requirements of the<br />

Tasmanian Fire Service. The developer is to supply and install water<br />

meters to all allotments. Water meter type is to be approved by the<br />

Director Engineering Services.<br />

24. Water meters are to be located so as to afford unobstructed access to<br />

service personnel.<br />

25. The provision of a reticulated sewerage system to the development with<br />

individual lot connections and method of disposal in accordance with<br />

the requirements of the Director Engineering Services. The system is<br />

to be designed by a Chartered Professional Engineer.<br />

26. Street lighting is to be provided in accordance with the requirements of<br />

Aurora Energy Pty Ltd and the Director Engineering Services. The<br />

street lighting is to be designed to minimise off site glare and reflected<br />

light. The use of non-standard lighting poles is not permitted within<br />

the development.<br />

27. Underground power is to be provided to the development in<br />

accordance with the requirements of Aurora Energy Pty. Ltd. and<br />

<strong>Council</strong>’s standard drawings and specifications.<br />

28. Telecommunications infrastructure is to be provided to the<br />

development in accordance with the requirements of Telstra and<br />

<strong>Council</strong>’s standard drawings and specifications.<br />

29. A plan of management is to be prepared and submitted for the<br />

approval of the Director Engineering Services, prior to disturbance or<br />

construction, outlining information and proposed construction<br />

practices in relation to:<br />

<strong>Waratah</strong>-<strong>Wynyard</strong> <strong>Council</strong> – Ordinary Meeting <strong>Minutes</strong> – <strong>21</strong> <strong>January</strong> <strong>2008</strong> Page 37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!