3.9 Summary of Risks to Site<br />
Table 6 contains a summary of <strong>the</strong> risks to <strong>the</strong> site. Mitigation measures to<br />
address identified risks are discussed in Section 0.<br />
Flood Risk<br />
Level of<br />
Risk<br />
Actions Required 5<br />
A14<br />
Embankments<br />
Low<br />
None<br />
Fluvial - Main<br />
River<br />
Highways Low None<br />
Bridleway<br />
Crossing<br />
Fluvial – Ordinary Watercourse<br />
Sea/Tidal<br />
High<br />
Low<br />
None<br />
identified<br />
Mitigation measures<br />
Ensure culvert capacities are<br />
assessed/designed based on<br />
DMRB methodology.<br />
None<br />
Ground<strong>water</strong> Medium Mitigation measures<br />
Surface Water Runoff Low Mitigation measures<br />
Artificial Drainage Systems<br />
Potentially<br />
High<br />
Fur<strong>the</strong>r investigation – visual<br />
assessment planned by<br />
<strong>drainage</strong> design team.<br />
Infrastructure Failure Low None<br />
Table 6: Summary of risks to <strong>the</strong> M1 Junction 19<br />
5 See Section 5 for fur<strong>the</strong>r details.<br />
15