5.7 Summary of Recommended Mitigation Measures<br />
Table 10 contains a summary of <strong>the</strong> recommended mitigation measures for <strong>the</strong><br />
Carleton developments.<br />
Flood Risk<br />
Scheme may increase<br />
fluvial flood risk in<br />
downstream <strong>water</strong>courses<br />
Scheme may be at risk of<br />
ground<strong>water</strong> flooding<br />
Flooding to <strong>the</strong> site as<br />
result of failure of Artificial<br />
Drainage Systems<br />
Infrastructure Failure<br />
Recommended Mitigation<br />
• Reduce <strong>the</strong> runoff rates to 60% of existing<br />
values by introduction of attenuation ponds<br />
• Introduce flood plain compensation for<br />
locations where proposed development is<br />
within Flood Zone 3a<br />
• Consider signage at bridleway crossings to<br />
inform users of <strong>the</strong> risk of flooding<br />
• Introduce filter drains <strong>and</strong> slope face<br />
<strong>drainage</strong> where necessary to control<br />
ground<strong>water</strong> levels<br />
• Perform more detailed <strong>drainage</strong> survey to<br />
identify existing issues with <strong>the</strong> <strong>drainage</strong><br />
system <strong>and</strong> culverts<br />
• Regular maintenance of <strong>drainage</strong> system<br />
<strong>and</strong> culverts<br />
• Pursue Severn Trent for more details of<br />
<strong>the</strong>ir assets in <strong>the</strong> area, including Stamford<br />
reservoir upstream of scheme <strong>and</strong> potential<br />
<strong>water</strong> supply pipes which run through <strong>the</strong><br />
site<br />
Table 10: Summary of recommended mitigation measures.<br />