- Page 1:
M1 Junction 19 Improvement Environm
- Page 4 and 5:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 6 and 7:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 8 and 9:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 10 and 11:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 12 and 13:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 14 and 15:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 16 and 17:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 18 and 19:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 20 and 21:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 22 and 23:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 24 and 25:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 26 and 27:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 28 and 29:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 30 and 31:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 32 and 33:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 34 and 35:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 36 and 37:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 38 and 39:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 40 and 41:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 42 and 43:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 44 and 45:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 46 and 47:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 48 and 49:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 50 and 51:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 52 and 53:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 54 and 55:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 56 and 57:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 58 and 59:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 69 and 70:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 71 and 72:
Appendix A - Pollution and Spillage
- Page 73:
Method D - Assessment of Pollution
- Page 76 and 77:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 78 and 79:
Groundwater: Hydrocarbons Hydrogeol
- Page 80 and 81:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 83 and 84:
Non Technical Summary Skanska Const
- Page 85 and 86:
Contents 1 Introduction 1 1.1 Overv
- Page 87 and 88:
1 Introduction 1.1 Overview Jacobs
- Page 89 and 90:
2 Policy Review 2.1 Planning Contex
- Page 91 and 92:
When the both the ‘Flood Zone’
- Page 93 and 94: 3 Flood Risk to the Proposed Develo
- Page 95 and 96: 3.2 Fluvial Flooding - Ordinary Wat
- Page 97 and 98: Major earthworks affecting surface
- Page 99 and 100: 3.7 Flooding from Infrastructure Fa
- Page 101 and 102: 3.9 Summary of Risks to Site Table
- Page 103 and 104: 4 Impacts of the Proposed Developme
- Page 105 and 106: 4.6 Summary of Flood Impacts from D
- Page 107 and 108: 5 Proposed Mitigation Measures 5.1
- Page 109 and 110: The extents of this problem are cur
- Page 111 and 112: 5.7 Summary of Recommended Mitigati
- Page 113 and 114: 6 Residual Risks The level of flood
- Page 115 and 116: 7 PPS25 Sequential and Exception Te
- Page 117 and 118: 8 Conclusion The M1 Junction 19 Imp
- Page 119 and 120: Appendix A Existing Layout, Environ
- Page 127 and 128: Appendix B Contractor’s Proposals
- Page 129 and 130: Appendix C Hydrogeological Assessme
- Page 131 and 132: Memorandum Fairbairn House, Ashton
- Page 133 and 134: Memorandum (Continued) Page 3 of 6
- Page 135 and 136: Memorandum (Continued) Page 5 of 6
- Page 141 and 142: Appendix D Volume Distribution for
- Page 143: Floodplain compensation area - elev