8 Conclusion<br />
The M1 Junction 19 Improvements scheme is considered to be at risk of fluvial<br />
flooding as parts of <strong>the</strong> scheme are located within flood zone 3a, <strong>the</strong> 1 in 100<br />
(1%) annual probability flood extents.<br />
The proposed development is classified as essential transport infrastructure <strong>and</strong><br />
is only permitted in zone 3a if <strong>the</strong> Exceptions Test is satisfied.<br />
Due to <strong>the</strong> location of <strong>the</strong> existing junction it is not possible to relocate this<br />
development outside of <strong>the</strong> floodplain.<br />
The Exception Test (PPS 25) has been completed for <strong>the</strong> development. The<br />
development has been shown to have wider sustainability benefits by reducing<br />
<strong>the</strong> stress, risk <strong>and</strong> travel time associated with driving between <strong>the</strong> M1 <strong>and</strong> A14.<br />
The specific locations at fluvial risk are:<br />
• The A14 on <strong>the</strong> eastern part of <strong>the</strong> scheme, specifically <strong>the</strong> embankment<br />
shoulders, <strong>the</strong> highway deck is unaffected<br />
• Bridleway Crossing 1 north of <strong>the</strong> A14 over <strong>the</strong> River Avon will be totally<br />
submerged in <strong>the</strong> 1 in 100 year event<br />
• Bridleway Crossing 2 between <strong>the</strong> M1 <strong>and</strong> A14 (sou<strong>the</strong>ast quadrant) will<br />
be totally submerged in <strong>the</strong> 1 in 100 year event<br />
To mitigate against <strong>the</strong> risk of increasing flooding downstream flood<br />
compensation areas have been proposed. Dimensions of <strong>the</strong> compensation<br />
areas can be found in Appendix D.<br />
There will be a net total increase in impermeable area associated with <strong>the</strong><br />
scheme <strong>and</strong> thus a commensurate increase in highway runoff. To mitigate<br />
against <strong>the</strong> effect of increased runoff in <strong>the</strong> River Avon, five attenuation ponds<br />
have been proposed. The design has been developed in consultation with <strong>the</strong><br />
EA. Details of <strong>the</strong> attenuation ponds can be found in Appendix B.<br />
It is recommended signage is incorporated at <strong>the</strong> bridleway crossing to inform<br />
users of <strong>the</strong> risk of flooding<br />
The scheme will involve deep cuttings for <strong>the</strong> Swinford <strong>Road</strong> underpass <strong>and</strong> <strong>the</strong><br />
A14-M1 link. This may result in ground<strong>water</strong> seepage. To mitigate against this<br />
risk filter drains <strong>and</strong> slope <strong>drainage</strong> are being considered by <strong>the</strong> contractor.<br />
It is recommended that Severn Trent is pursued by <strong>the</strong> designers in respect of<br />
<strong>the</strong>ir assets (<strong>water</strong> supply) which appear to pass through <strong>the</strong> site.<br />
It is anticipated that <strong>the</strong> level of residual risk to <strong>the</strong> site, following <strong>the</strong><br />
implementation of all identified mitigation measures, will fully satisfy <strong>the</strong><br />
requirements of PSS 25.<br />
.<br />
31