19.05.2014 Views

Chapter 9: Road drainage and the water environment

Chapter 9: Road drainage and the water environment

Chapter 9: Road drainage and the water environment

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

M1 JUNCTION 19 IMPROVEMENT<br />

ENVIRONMENTAL STATEMENT VOLUME 2<br />

CHAPTER 9 – ROAD DRAINAGE AND THE WATER ENVIRONMENT<br />

Study Area<br />

9.1.10 The Study Area consists of all of <strong>the</strong> surface <strong>water</strong> <strong>and</strong> ground<strong>water</strong> resources likely to be<br />

directly or indirectly affected including, in particular, <strong>the</strong> River Avon <strong>and</strong> its tributaries.<br />

9.1.11 Sensitive surface <strong>water</strong> <strong>and</strong> ground<strong>water</strong> features within <strong>the</strong> study area are identified <strong>and</strong><br />

<strong>the</strong> potential impacts arising from <strong>the</strong> construction <strong>and</strong> operation of <strong>the</strong> scheme are<br />

assessed. The extent of <strong>the</strong> study area <strong>and</strong> features identified are illustrated on Figure 9.1.<br />

A glossary of technical terms used in this <strong>Chapter</strong> is at Appendix B.<br />

The Project<br />

9.1.12 Junction 19 of <strong>the</strong> M1 currently forms an interchange between <strong>the</strong> M1, M6 <strong>and</strong> A14 Trunk<br />

<strong>Road</strong>. In addition, it provides access to two minor roads, Rugby <strong>Road</strong> to Swinford <strong>and</strong><br />

Swinford <strong>Road</strong> to Catthorpe, both of which connect to <strong>the</strong> A14 Trunk <strong>Road</strong>.<br />

9.1.13 A Comparative Environmental Assessment published in 2008 considered <strong>the</strong> potential<br />

impacts of five different options for <strong>the</strong> junction <strong>and</strong> <strong>the</strong> local road network. Following that<br />

assessment, <strong>the</strong> Red Junction <strong>and</strong> Orange Local <strong>Road</strong> Network was announced as <strong>the</strong><br />

Preferred Route.<br />

9.1.14 The project is illustrated by a series of plans bound into a separate Appendix 1 to Volume 1<br />

of <strong>the</strong> ES as follows:-<br />

Interaction<br />

• Figure A : Location Plan<br />

• Figure B : Environmental Master Plan<br />

• Figure C : Environmental Resources Plan<br />

• Figure G : Areas Required During Construction<br />

• Figure H : Cross Sections<br />

9.1.15 There are interactions between this chapter <strong>and</strong> o<strong>the</strong>r chapters as follows:-<br />

• <strong>Chapter</strong> 3, Ecology <strong>and</strong> Nature Conservation, sets out <strong>the</strong> value of <strong>water</strong> features, <strong>and</strong><br />

potential impacts upon <strong>the</strong>m, as wildlife habitats.<br />

• <strong>Chapter</strong> 5, Materials, interacts with <strong>the</strong> ground<strong>water</strong> element of this chapter.<br />

9.1.16 Care has been taken to avoid significant overlap or double counting of adverse impacts or<br />

benefits resulting from <strong>the</strong> proposals.<br />

B0531000_ID_70-EIA Vol 2 Chap 9 <strong>Road</strong> Drainage <strong>and</strong> <strong>the</strong> Water Environment Final Rev 4.doc Page 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!