3 Flood Risk to <strong>the</strong> Proposed Development<br />
3.1 Fluvial Flooding – Main River<br />
Fluvial flooding refers to flooding from rivers, streams <strong>and</strong> o<strong>the</strong>r inl<strong>and</strong> natural<br />
<strong>water</strong>courses. It is usually caused by prolonged or intense rainfall, generating<br />
high rates of runoff which overwhelm <strong>the</strong> capacity of <strong>the</strong> river or channel. When<br />
this occurs, excess <strong>water</strong> will spill onto low-lying areas of l<strong>and</strong> adjacent to <strong>the</strong><br />
channel. This area is known as <strong>the</strong> floodplain.<br />
In Engl<strong>and</strong>, <strong>the</strong> term ‘Main River’ is given to strategically important <strong>water</strong>ways<br />
that drain a catchment. They are defined by lines drawn on a statutory map held<br />
by <strong>the</strong> government (Defra).<br />
Main Rivers are not always <strong>the</strong> biggest rivers in a catchment but <strong>the</strong>y are<br />
hydraulically important to how <strong>water</strong> drains from a catchment. Consequently, <strong>the</strong>y<br />
also tend to be associated with <strong>the</strong> greatest flood risks.<br />
The Environment Agency has permissive powers, but not a duty, to carry out<br />
flood defence works on Main Rivers.<br />
3.1.1 Initial Investigation<br />
The nearest Main River is <strong>the</strong> River Avon, which flows from east to west. It<br />
passes under <strong>the</strong> A14 via a formal bridge crossing.<br />
The widening of <strong>the</strong> A14 slip roads will require embankments which encroach on<br />
flood zone 3a (see Figure 2 <strong>and</strong> Figure 8 in Appendix B). The embankments will<br />
<strong>the</strong>refore experience flooding in <strong>the</strong> 1 in 100 (1%) annual probability event,<br />
however since <strong>the</strong> A14 road level is significantly above <strong>the</strong> 1 in 100 (1%) annual<br />
probability level <strong>the</strong> consequence of flooding is thought to be minimal i.e. does<br />
not represent a tangible risk to road users. Flood risk to <strong>the</strong> A14 embankments<br />
(shoulders) from <strong>the</strong> Main River is considered low.<br />
The river continues to <strong>the</strong> west between <strong>the</strong> A14 <strong>and</strong> <strong>the</strong> M1 where it passes<br />
under <strong>the</strong> M1 under a formal bridge crossing. There is no proposal to change <strong>the</strong><br />
existing highway bridge crossings <strong>the</strong>refore <strong>the</strong> <strong>water</strong> levels will remain <strong>the</strong> same.<br />
The M1 <strong>and</strong> A14 are both significantly elevated (5.2m <strong>and</strong> 1.4m respectively)<br />
above <strong>the</strong> River Avon 1 in 100 (1%) annual probability levels <strong>the</strong>refore <strong>the</strong> flood<br />
risk to <strong>the</strong> M1 <strong>and</strong> A14 highways from <strong>the</strong> Main River is considered very<br />
low.<br />
Upstream of <strong>the</strong> A14 <strong>and</strong> between <strong>the</strong> A14 <strong>and</strong> <strong>the</strong> M1 <strong>the</strong>re are proposed<br />
bridleway crossings shown in Figure 2. The proposed bridleway bridges<br />
upstream of <strong>the</strong> A14 will be replacing an existing bridge of simple timber<br />
construction. Whilst <strong>the</strong> bridleway bridge between <strong>the</strong> A14 <strong>and</strong> M1 will be a new<br />
bridge. The deck level <strong>and</strong> approach ramps of <strong>the</strong> proposed bridges will be below<br />
<strong>the</strong> 1 in 100 (1%) annual probability flood level. This design has been agreed with<br />
<strong>the</strong> Environment Agency. The structure will be at risk from flooding, fur<strong>the</strong>rmore<br />
users of <strong>the</strong> bridge will be at risk from flooding. Flood risk to this bridleway<br />
bridge is <strong>the</strong>refore considered to be high <strong>and</strong> some degree of mitigation<br />
will be required (see Section 5).<br />
7