Table 9: Summary of proposed works to culverts ( Contractors Proposal for<br />
Drainage, 2009)<br />
From Table 9 above it can be seen that 6 of <strong>the</strong> 7 culverts will require<br />
modifications. Culvert C/5 will be replaced with a smaller (existing = 1200mm<br />
diameter, proposed = 900mm diameter) culvert since this will be conveying l<strong>and</strong><br />
<strong>drainage</strong> only <strong>and</strong> not highway runoff as was <strong>the</strong> case for <strong>the</strong> existing<br />
configuration.<br />
The design team plan to perform a survey on <strong>the</strong> <strong>drainage</strong> system. It is<br />
recommended that this includes a visual assessment of <strong>the</strong> culverts described<br />
above to identify any issues <strong>and</strong> mitigate against <strong>the</strong>m.<br />
The complete <strong>drainage</strong> proposal <strong>the</strong>refore provides an acceptable<br />
mitigation against increasing flood risk.<br />
5.5 Mitigation of Flood Risks from Infrastructure Failure<br />
The level of risk as a result of infrastructure failure is considered to be low.<br />
However, it is suggested that more details of <strong>the</strong> assets shown on <strong>the</strong> Severn<br />
Trent service layouts are obtained. Fur<strong>the</strong>r ground investigation/trial pits may be<br />
required to identify <strong>the</strong> nature <strong>and</strong> location of Severn Trent’s assets which conflict<br />
with <strong>the</strong> location of <strong>the</strong> proposed scheme. Diversion of Severn Trent’s assets<br />
may be required.<br />
5.6 Incidental Mitigation Measures<br />
Due to <strong>environment</strong>al concerns <strong>the</strong> river banks of <strong>the</strong> Avon will be widened to<br />
create habitat for otters. The extents of <strong>the</strong> widening has is not confirmed at this<br />
stage of <strong>the</strong> project. The effect of <strong>the</strong> river widening, though not <strong>the</strong> purpose, will<br />
be to increase <strong>the</strong> conveyance <strong>and</strong> storage capacity of <strong>the</strong> river channel, in turn<br />
lowering flood levels <strong>and</strong> flood risk.<br />