4 Impacts of <strong>the</strong> Proposed Development on Flood Risk<br />

Elsewhere<br />

4.1 Impacts on Fluvial Flood Risk<br />

The effect of <strong>the</strong> M1 Junction 19 improvements proposal on fluvial flood risk can<br />

be summarised as follows:<br />

• The expansion in impermeable area will result in a net increase in <strong>the</strong><br />

volume of highway runoff <strong>and</strong> also in <strong>the</strong> peak runoff flow rate. If this<br />

runoff is allowed to discharge freely into <strong>the</strong> adjacent l<strong>and</strong> drains <strong>and</strong><br />

ditches (<strong>and</strong> subsequently into <strong>the</strong> River Avon) it would have <strong>the</strong> effect of<br />

increasing fluvial flood risk.<br />

• The widening of <strong>the</strong> embankments along <strong>the</strong> A14 will have <strong>the</strong> effect of<br />

displacing <strong>the</strong> floodplain <strong>and</strong> reducing <strong>the</strong> total volume of storage<br />

available to <strong>the</strong> river in times of spate. This would have <strong>the</strong> effect of<br />

increasing <strong>water</strong> levels <strong>and</strong> <strong>the</strong>refore increasing fluvial flood risk.<br />

Therefore, it is important that any increases in flow volumes <strong>and</strong> displacement of<br />

<strong>the</strong> floodplain are carefully managed in line with Environment Agency<br />

requirements (discussed in Section 0, Proposed Mitigation Measures).<br />

Limited information regarding <strong>the</strong> bridleway bridge crossings is available at this<br />

time. A simplified Manning’s assessment of <strong>the</strong> bridges based on an assumed<br />

rectangular cross section measuring 5m wide <strong>and</strong> 1.5m deep indicates that <strong>the</strong><br />

bridge will be surcharged at low return period flows i.e. approximately 1 in 2 yr or<br />

less. The low deck height of <strong>the</strong> bridleway bridge is required due to <strong>the</strong> proposed<br />

use of <strong>the</strong> bridge (a low gradient is required to improve accessibility to all users).If<br />

<strong>the</strong> bridge was to be raised out above <strong>the</strong> 1 in 100 (1%) annual probability flood<br />

levels, <strong>the</strong> height required would be significant. This would also require large<br />

lengths of <strong>the</strong> bridleway to also be raised which would have a greater impact on<br />

flood risk than <strong>the</strong> bridge alone.<br />

The impact of bridges will be to reduce <strong>the</strong> conveyance of <strong>the</strong> river channel<br />

sections at <strong>the</strong>se two locations. This may have an impact of backing up flows <strong>and</strong><br />

raising <strong>water</strong> levels upstream of <strong>the</strong> bridges. However, as <strong>the</strong> bridges will remain<br />

low this impact will be minimised. The bridges may have <strong>the</strong> effect of flooding <strong>the</strong><br />

adjacent fields more frequently, <strong>and</strong> <strong>the</strong>refore increasing <strong>the</strong> risk to farml<strong>and</strong><br />

marginally. At higher return period events <strong>the</strong> bridge <strong>and</strong> approach ramps will be<br />

overtopped <strong>and</strong> bypassed.<br />

4.2 Impacts on Ground<strong>water</strong> Flooding<br />

The scheme proposals include provision for deep excavation below <strong>the</strong> adjacent<br />

ground <strong>water</strong> level for <strong>the</strong> Swinford <strong>Road</strong> underpass <strong>and</strong> <strong>the</strong> A14-M6 link. Slope<br />

face <strong>drainage</strong> has been proposed in <strong>the</strong> Contractor’s Drainage Report to control<br />

ground<strong>water</strong> seepage. Such a system of drains will have <strong>the</strong> effect of lowering<br />

ground<strong>water</strong> levels locally, with a decreasing effect fur<strong>the</strong>r away from <strong>the</strong><br />

scheme. At this broad level of assessment it is not thought that <strong>the</strong> scheme will<br />

increase <strong>the</strong> ground<strong>water</strong> levels or <strong>the</strong> ground<strong>water</strong> flood risk elsewhere.<br />