Chapter 9: Road drainage and the water environment
Chapter 9: Road drainage and the water environment
Chapter 9: Road drainage and the water environment
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
M1 JUNCTION 19 IMPROVEMENT<br />
ENVIRONMENTAL STATEMENT VOLUME 2<br />
CHAPTER 9 – ROAD DRAINAGE AND THE WATER ENVIRONMENT<br />
42 Ground<strong>water</strong> Vulnerability of Leicestershire, Sheet 23, scale 1:100000, Environment<br />
Agency, 1996<br />
43 Ground<strong>water</strong> Vulnerability of Nor<strong>the</strong>rn Cotswolds, Sheet 30, scale 1:100000, Environment<br />
Agency, 1996<br />
44 M1 Junction 19 Improvement, Contractor’s Proposals for Drainage, November 2009,<br />
prepared by Skanska & Jacobs for <strong>the</strong> Highway Agency<br />
45 Flood Risk Assessment: Final Report, July 2005 (updated October 2005), JBA Consulting<br />
46 Control of pollution from highway <strong>drainage</strong> discharges, CIRIA report 142, 1994.<br />
47 Junction 19 M1 Addendum to Flood Risk Assessment, JBA Consulting, May 2007.<br />
48 M1 Junction 19 Improvement Flood Risk Assessment, Jacobs, 2009<br />
49 Catthorpe Viaduct Replacement Environmental Assessment, Highways Agency. January<br />
2010.<br />
B0531000_ID_70-EIA Vol 2 Chap 9 <strong>Road</strong> Drainage <strong>and</strong> <strong>the</strong> Water Environment Final Rev 4.doc Page 50