- Page 1: M1 Junction 19 Improvement Environm
- Page 4 and 5: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 6 and 7: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 8 and 9: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 10 and 11: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 14 and 15: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 16 and 17: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 18 and 19: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 20 and 21: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 22 and 23: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 24 and 25: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 26 and 27: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 28 and 29: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 30 and 31: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 32 and 33: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 34 and 35: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 36 and 37: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 38 and 39: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 40 and 41: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 42 and 43: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 44 and 45: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 46 and 47: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 48 and 49: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 50 and 51: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 52 and 53: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 54 and 55: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 56 and 57: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 58 and 59: M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 69 and 70:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 71 and 72:
Appendix A - Pollution and Spillage
- Page 73:
Method D - Assessment of Pollution
- Page 76 and 77:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 78 and 79:
Groundwater: Hydrocarbons Hydrogeol
- Page 80 and 81:
M1 JUNCTION 19 IMPROVEMENT ENVIRONM
- Page 83 and 84:
Non Technical Summary Skanska Const
- Page 85 and 86:
Contents 1 Introduction 1 1.1 Overv
- Page 87 and 88:
1 Introduction 1.1 Overview Jacobs
- Page 89 and 90:
2 Policy Review 2.1 Planning Contex
- Page 91 and 92:
When the both the ‘Flood Zone’
- Page 93 and 94:
3 Flood Risk to the Proposed Develo
- Page 95 and 96:
3.2 Fluvial Flooding - Ordinary Wat
- Page 97 and 98:
Major earthworks affecting surface
- Page 99 and 100:
3.7 Flooding from Infrastructure Fa
- Page 101 and 102:
3.9 Summary of Risks to Site Table
- Page 103 and 104:
4 Impacts of the Proposed Developme
- Page 105 and 106:
4.6 Summary of Flood Impacts from D
- Page 107 and 108:
5 Proposed Mitigation Measures 5.1
- Page 109 and 110:
The extents of this problem are cur
- Page 111 and 112:
5.7 Summary of Recommended Mitigati
- Page 113 and 114:
6 Residual Risks The level of flood
- Page 115 and 116:
7 PPS25 Sequential and Exception Te
- Page 117 and 118:
8 Conclusion The M1 Junction 19 Imp
- Page 119 and 120:
Appendix A Existing Layout, Environ
- Page 127 and 128:
Appendix B Contractor’s Proposals
- Page 129 and 130:
Appendix C Hydrogeological Assessme
- Page 131 and 132:
Memorandum Fairbairn House, Ashton
- Page 133 and 134:
Memorandum (Continued) Page 3 of 6
- Page 135 and 136:
Memorandum (Continued) Page 5 of 6
- Page 141 and 142:
Appendix D Volume Distribution for
- Page 143 and 144:
Floodplain compensation area - elev
- Page 145:
Depth Bands (m) TOTAL (m³) Area Re