<strong>water</strong>course, one of which would replace an existing rudimentary crossing north<br />
of <strong>the</strong> A14, <strong>the</strong> o<strong>the</strong>r would be a new crossing between <strong>the</strong> A14 <strong>and</strong> M1.<br />
A public consultation was held between June <strong>and</strong> September 2008 seeking <strong>the</strong><br />
views of <strong>the</strong> public on three junction options <strong>and</strong> three local road network options.<br />
There was support for an improvement scheme, with <strong>the</strong> Red Junction <strong>the</strong> most<br />
favoured. Of <strong>the</strong> three local road network options, <strong>the</strong> Orange Local <strong>Road</strong><br />
Network was <strong>the</strong> most favoured.<br />
The outline preferred option is shown below in Figure 1.<br />
Orange Local <strong>Road</strong><br />
Network<br />
Red Junction Option<br />
Figure 1: The preferred route: The Red Junction <strong>and</strong> Orange Local <strong>Road</strong> Network<br />
1.3 Previous FRA’s<br />
Throughout <strong>the</strong> evolving design process a number of flood risk assessments<br />
have been performed. A list of previous flood risk assessments is given below:<br />
• Flood Risk Assessment completed by (JBA Consulting, July 2005)<br />
• Addendum to stage 3 flood risk assessment – flood plain compensation<br />
(JBA, October 2005)<br />
• Addendum to Flood Risk Assessment produced to fulfil PPS 25<br />
requirements (JBA, May 2007 )<br />
This FRA seeks to take <strong>the</strong> re-design as an opportunity to produce a new st<strong>and</strong>alone<br />
FRA which will draw toge<strong>the</strong>r all relevant information in a format which is<br />
more suitable for <strong>the</strong> current planning <strong>environment</strong>.<br />