2.2.3 PPS25 Sequential Test<br />

The Sequential Test is used to examine <strong>the</strong> possibility of relocating development in<br />

areas found to be at medium <strong>and</strong> high probability of flooding from rivers <strong>and</strong> <strong>the</strong> sea<br />

to areas of low probability. The definition of low, medium <strong>and</strong> high probability flood<br />

risk areas is determined in PPS25 <strong>and</strong> is shown below Table 1.<br />

Flood Zone 1<br />

Flood Zone 2<br />

Flood Zone 3a<br />

Flood Zone 3b<br />

Low<br />

Probability<br />

Medium<br />

Probability<br />

High<br />

Probability<br />

The<br />

Functional<br />

Floodplain<br />

This zone comprises l<strong>and</strong> assessed as having<br />

less than 1 in 1000 annual probability of river or<br />

sea flooding in any year (1% AEP) or a 1 in 200 or greater<br />

annual probability of flooding from <strong>the</strong> sea (>0.5%<br />

AEP) in any year.<br />

This zone comprises l<strong>and</strong> where <strong>water</strong> has to flow<br />

or be stored in times of flood. Strategic Flood<br />

Risk Assessments (SFRA) should identify this<br />

Flood Zone (l<strong>and</strong> which would flood with an<br />

annual probability of 1 in 20 (5% AEP) or greater<br />

in any year or is designed to flood in an extreme<br />

(0.1% AEP) flood or at ano<strong>the</strong>r probability to be<br />

agreed between <strong>the</strong> LPA <strong>and</strong> <strong>the</strong> Environment<br />

Agency, including <strong>water</strong> conveyance routes).<br />

Table 1: Definition of Flood Zones (from PPS25 Table D1)<br />

If areas at lower flood risk are not available or appropriate, <strong>the</strong>n vulnerability of <strong>the</strong><br />

proposed development to <strong>the</strong> effects of flooding are considered. Within PPS25, <strong>the</strong><br />

vulnerability of different types of development is given. These are shown in <strong>the</strong> table<br />

below:<br />

Essential<br />

Infrastructure<br />

Highly<br />

Vulnerable<br />

More<br />

Vulnerable<br />

Less<br />

Vulnerable<br />

Water<br />

Compatible<br />

Essential transport infrastructure (including mass evacuation routes)<br />

that has to cross <strong>the</strong> area at risk, <strong>and</strong> strategic utility infrastructure,<br />

including electricity generating power stations <strong>and</strong> grid <strong>and</strong> primary<br />

substations.<br />

Police stations, ambulance stations <strong>and</strong> fire stations <strong>and</strong> comm<strong>and</strong><br />

centres <strong>and</strong> telecommunications installations required to be operational<br />

during flooding; emergency dispersal points; basement dwellings;<br />

caravans, mobile homes <strong>and</strong> park homes intended for permanent<br />

residential use; installations requiring hazardous substances consent.<br />

Hospitals; residential institutions; dwelling houses; pubs, clubs, hotels;<br />

health centres, nurseries, schools; l<strong>and</strong>fill <strong>and</strong> sites for hazardous<br />

waste; sites used for holiday, short let caravans <strong>and</strong> camping.<br />

Retail, offices, warehouses, workshops, leisure; agriculture; nonhazardous<br />

waste treatment; mineral working; <strong>water</strong> treatment plants;<br />

sewage treatment plants.<br />

Flood control infrastructure; <strong>water</strong> transmission infrastructure; docks,<br />

marinas, wharves; navigation facilities; MOD defence installations; ship<br />

building; <strong>water</strong> based recreation; lifeguard stations; amenity open<br />

spaces <strong>and</strong> s<strong>and</strong> <strong>and</strong> gravel workings.<br />

Table 2: Development Vulnerability (as defined in PPS25 Table D2)<br />

2 AEP: Annual Exceedance Probability<br />

4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!