6 Residual Risks<br />
The level of flood risk to <strong>the</strong> M1 Junction 19 has been investigated at an<br />
appropriate level of detail. Suitable mitigation measures have been identified for<br />
<strong>the</strong>se risks.<br />
Consequently, <strong>the</strong> flood risk to <strong>the</strong> development, if <strong>the</strong> recommended mitigation<br />
measures are followed, will be low.<br />
However, <strong>the</strong>re is always a residual risk that an event will occur that exceeds <strong>the</strong><br />
design criteria.<br />
Table 11 identifies what are considered to be <strong>the</strong> residual risks to <strong>the</strong> site:<br />
Risk Impacts Potential Fur<strong>the</strong>r<br />
Mitigation Measures<br />
Extreme rainfall event<br />
greater than <strong>drainage</strong><br />
system design event.<br />
Failure of to maintain<br />
artificial <strong>drainage</strong><br />
systems (i.e. highway<br />
<strong>drainage</strong>, l<strong>and</strong> drains).<br />
Failure of 3 rd parties to<br />
maintain essential<br />
infrastructure (i.e.<br />
reservoirs, <strong>water</strong> supply<br />
network).<br />
• Water build up on<br />
highway<br />
• Water built up on<br />
highways<br />
• Impounding of <strong>water</strong><br />
against highway<br />
embankment<br />
• Water flow along<br />
highways<br />
• Consider alternative<br />
<strong>drainage</strong> routes<br />
based on road<br />
camber/topography<br />
only<br />
• Consider alternative<br />
<strong>drainage</strong> routes<br />
based on<br />
road/camber<br />
topography only<br />
• Regular inspection of<br />
culverts,<br />
implementation of<br />
trash screens<br />
• Pursue Severn Trent<br />
for more details of<br />
<strong>the</strong>ir assets in <strong>the</strong><br />
area, including<br />
Stamford reservoir<br />
upstream of scheme<br />
<strong>and</strong> potential <strong>water</strong><br />
supply pipes which<br />
run through <strong>the</strong> site<br />
Table 11: Potential residual risks to site<br />