14.06.2014 Views

Carvins Cove Trail Plan - Roanoke

Carvins Cove Trail Plan - Roanoke

Carvins Cove Trail Plan - Roanoke

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Carvins</strong> <strong>Cove</strong> Natural Reserve<br />

2010 <strong>Trail</strong> Management <strong>Plan</strong><br />

<strong>Carvins</strong> <strong>Cove</strong> <strong>Trail</strong> Assessment Form<br />

Date<br />

<strong>Trail</strong> Name: <strong>Trail</strong> Length Half rule<br />

Exceeds 1/2 rule<br />

<strong>Trail</strong> Start:<br />

<strong>Trail</strong> End:<br />

Attractions/Detractions<br />

<strong>Trail</strong> Junctions:<br />

Sum of Grades<br />

0-5% Sum of Surface Sum of Width<br />

6-10 Paved < 2 ft<br />

Assessment Team<br />

11-15 Gravel 2-4 ft.<br />

16-20 Cinder 4.1-8 ft.<br />

21-30 Hard soil 8.1-12 ft<br />

>30% Soft soil >12 ft.<br />

Station<br />

(ft)<br />

Tread<br />

Width<br />

(in)<br />

Tread X-<br />

slope<br />

-%=in Hillside<br />

+%=out Slope % Surface<br />

Grade<br />

(+%)<br />

Feat.<br />

No.<br />

0 1<br />

2<br />

Feat.<br />

Station<br />

<strong>Trail</strong>/<br />

View<br />

Cond.<br />

1=Good<br />

5=Bad<br />

Feature Type, Materials, Description, Details, Needs<br />

Figure 6. <strong>Trail</strong> Assessment Form<br />

Field data was typed into Excel worksheets after each assessment and calculations and<br />

analysis completed. For each trail there was one worksheet for the field data and three<br />

additional worksheets to calculate statistics about the trail. The Assessment Team was<br />

asked to review this data for corrections and clarifications and used the information in<br />

discussions of sustainability and recommendations for specific trails.<br />

2.3.3 Mapping<br />

The Parks and Recreation Department produced a map of the official trails in 2003.<br />

<strong>Trail</strong>s that have been relocated since then were mapped again using Garmin GPS<br />

equipment. <strong>Trail</strong>s that show on old USGS maps, other trails, new social trails, and other<br />

trails that could be found were recorded using Trimble GPS equipment. The trail map<br />

of existing and recommended trails is attached at the end of this plan.<br />

2.4 Input from Stakeholders<br />

During the assessment process, the Task Force contacted users and interest groups for<br />

input on the trail plan. Information paragraphs were included in newsletters of the<br />

<strong>Roanoke</strong> Appalachian <strong>Trail</strong> Club, <strong>Roanoke</strong> Valley Horsemen’s Association, and through<br />

other e-mail groups such as the Star City Striders and Blue Ridge Bicycle Club. In<br />

addition, all volunteers who had helped with trail work at the <strong>Cove</strong> in the last eight<br />

years were contacted by e-mail for written input. A compilation of this input is<br />

included in Appendix D.<br />

Recurring themes mentioned in this input include:<br />

17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!