19.06.2014 Views

2013/16 Metropolitan Transportation Improvement Program ... - sacog

2013/16 Metropolitan Transportation Improvement Program ... - sacog

2013/16 Metropolitan Transportation Improvement Program ... - sacog

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sacramento Area Council of Governments<br />

Appendix 4 Project List<br />

SACOG ID ELD19341 ELD Lead Agency El Dorado County Dept of <strong>Transportation</strong><br />

Project TItle<br />

Blair Rd/EID Canal Bridge Replacement<br />

EA Number:n/a<br />

Last Revised<br />

VAR79008 -<br />

Completion Year<br />

13-00 2018<br />

Grouped Listing Title:<br />

Grouped Projects for Bridge Rehabilitation and<br />

Reconstruction - HBP <strong>Program</strong><br />

Project Description<br />

Blair Rd, over EID Canal, 0.7 mi N/O Pony Express Trail.<br />

Replace the existing 1 lane functionally obsolete bridge<br />

with a new 2 lane bridge. (Toll credits for PE, ROW, &<br />

CON.) (CIP77119)<br />

Fed FY Revenue Source Engineering Right of Way Construction Total Revenue<br />

<strong>16</strong><br />

Highway Bridge <strong>Program</strong><br />

$0<br />

$0<br />

$605,000 $605,000<br />

$107,000 $107,000<br />

$2,787,000 $2,787,000<br />

$3,499,000<br />

$3,499,000<br />

Bridge Number: 25C0077<br />

Federal Project<br />

Total Cost $3,499,000<br />

Exempt<br />

Category:<br />

Projects that correct, improve, or eliminate a hazardous location or feature.<br />

<strong>2013</strong> MTIP - Page <strong>16</strong>5 of 390<br />

Page 45 of 207<br />

Tuesday, September 25, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!